Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 9 of 9

Full-Text Articles in Public Affairs, Public Policy and Public Administration

Geophysical Approaches To Coal Exploration, Gerald B. Rupert Oct 1976

Geophysical Approaches To Coal Exploration, Gerald B. Rupert

UMR-MEC Conference on Energy / UMR-DNR Conference on Energy

The exploration for minerals by geophysical means has been confined largely to the search for hydrocarbons and metallics while applications to coal exploration are somewhat limited. However, the surface reflection seismic technique has been successfully applied not only to delineating coal deposits but also as a tool in mine exploitation. Furthermore, channel waves generated underground have demonstrated potential in detecting the presence of faults in advance of the coal face and Vibroisis* experiments have been conducted whereby abandoned underground workings have been detected by surface seismic arrays. Examples of all of the preceeding are presented and discussed.


The Cost Of Environmental Protection: A Review, Ian T. Ball Apr 1976

The Cost Of Environmental Protection: A Review, Ian T. Ball

IUSTITIA

Dan Richardson's study is "an attempt to analyze present regulatory procedures in the New Jersey coastal zone, with an emphasis on the cost of these procedures to residential developers and housing consumers." Specifically, twenty-one residential developments in a coastal township were monitored from acquisition of land to final approval of the development proposal, and the costs of regulatory approvals, consulting engineering, legal, and governmental fees, as well as holding costs incurred by the developer, were itemized. The costs of the regulatory process were then broken down according to costs incurred during the local regulatory process and those costs resulting from …


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Maine Comprehensive Energy Plan, Maine. Office Of Energy Resources Jan 1976

Maine Comprehensive Energy Plan, Maine. Office Of Energy Resources

Dickey-Lincoln School Lakes Project

Prepare a comprehensive energy resources plan to be revised and updated at least annually and more often as the Director of the Office of Energy Resources or the State Legislature deem necessary.


Energy - Minerals - Environment: How Now Brown Cow?, Bobby G. Wixson Jan 1976

Energy - Minerals - Environment: How Now Brown Cow?, Bobby G. Wixson

UMR-MEC Conference on Energy / UMR-DNR Conference on Energy

Energy, technical, social, political, economic, and environmental problems are all people related problems which will continue to increase along with the world's population. With the growing demands for more energy and minerals along with the constraints of protecting the environment, new approaches must be considered to these complex problems.

Energy sources, modifications, alternatives, and new developments must be considered for the present as short term resources (next 25- 30 years) and in the future as long range research necessary to develop and implement new technology (25 years on). Major energy sources and their environmental considerations are generally classified as:

I. …


Local Environmental Management, A Case Study: The Virginia Wetlands Act, 1972-1974, John Claiborne Jones Jan 1976

Local Environmental Management, A Case Study: The Virginia Wetlands Act, 1972-1974, John Claiborne Jones

Dissertations, Theses, and Masters Projects

No abstract provided.