Ddasaccident587, Hd-Aid Jun 2010

Ddasaccident587, Hd-Aid

Global CWD Repository

On the 22nd of June 2010 an uncontrolled detonation occurred at [Name of demining group removed] task site DA-SR-3948 in Central Equatoria within the confines of the control point. The detonation fatally injured the team medic and minor injuries were sustained to one of the team deminers’ who was in close proximity to the seat of explosion. For additional information regarding this BOI and full report see reference D [Not made available].


Ddasaccident676, Hd-Aid Jun 2010

Ddasaccident676, Hd-Aid

Global CWD Repository

While the deminer try to investigate a signal indicated by the metal detector in an expected site of an AP M14 mine, the deminer didn’t approach the signal in the proper procedure and hit the mine with the heavy Rake on the pressure plate which activated the mine and caused the blast 200 away from the deminer


Ddasaccident728, Hd-Aid Jun 2010

Ddasaccident728, Hd-Aid

Global CWD Repository

On 17 June 2010 at 11:00 [the Victim] was busy in his clearance lane in a steep sloping area, he lost his balance, got out from his clearance lane to unclear ground, stepped on a YM-I mine and the accident happened. According to the investigation report the team is walking around one and half hours from the base comp to the MF on daily basis which makes the deminers tired. The marking signs in clearance lane were weak and even not distinguishable; the gritty and sliding nature of the ground is another risk factor in this specific minefield. Extra safety …


Ddasaccident664, Hd-Aid Jun 2010

Ddasaccident664, Hd-Aid

Global CWD Repository

On 10 of June 2010 the first day of operation in task 0040, all the team members had been briefed by team leader about the location and extent of contamination in the area. The deminers were tasked to establish admin. parking areas, control marking and create the baseline. The team members also started clearance operations in some lanes and the deminer [the Victim] was tasked to follow the marking of already cleared lanes. But because of the break time he left the area and entered into the task seeking a shadow to take break there. He wanted to enter to …


Ddasaccident597, Hd-Aid Jun 2010

Ddasaccident597, Hd-Aid

Global CWD Repository

The primary cause of this accident is listed as “Inadequate survey” because there seems to have been confusion about the area that required search. The secondary cause is listed as a “Management Control Inadequacy” because the failure to search the areas that were very obviously hazardous appears to have been the result of poor communication, a lack of adequate task documentation, a failure to keep MDD working records, poor understanding of Technical Survey, and other “shortcuts” that commercial demining groups may be expected to make when inadequately tasked.


Ddasaccident749, Hd-Aid Jun 2010

Ddasaccident749, Hd-Aid

Global CWD Repository

On 09:05 during the break time [the Victim] entered into the hazard area in order to proceed to a mosque located inside the AIF to get his break there. Unfortunately one metre away from the gate of mosque he stepped on an IED and caused it to detonate which resulted in a fatal accident. According to the statements of team leader and deputy team leader, they were busy with measuring Turning Points and tasking of the deminers in their clearance lane. After 5 minutes the deputy team leader and paramedic arrived to the site, cleared a lane towards the accident …


Ddasaccident747, Hd-Aid May 2010

Ddasaccident747, Hd-Aid

Global CWD Repository

Deminers reported that the Victim was in a particularly happy mood that day. The Victim went to the grenade without telling anyone and began to dismantle it. His actions can be reliably inferred because the black cap of the grenade was undamaged at the site (and featured in the first site photographs after the accident). So it seems that the Victim got some way into the grenade before it went off in his hands. Severe hand (amputated fingers), arm, and upper body injury resulted - with bubbling blood and air from open chest wounds. From this it is inferred that …


Ddasaccident594, Hd-Aid May 2010

Ddasaccident594, Hd-Aid

Global CWD Repository

On 04 May 2010 at 08:45 am while [the Victim] the de-miner was excavating a detected signal in his clearance lane, his bayonet hit top of an anti-personnel PMN mine and caused it to go off. According to the investigation report, it seems that the de-miner started excavation directly from the pinpointed spot with his bayonet and caused the explosion and accident. Unfortunately improper use of PPE caused catastrophic injuries to the face and eyes of the victim deminer. He has lost his right eye, traumatic amputation of right-hand fingers and sustained some superficial injures on different parts of his …


Ddasaccident589, Hd-Aid Apr 2010

Ddasaccident589, Hd-Aid

Global CWD Repository

The team leader [the Victim] was doing a QA check on one of the Foot Track already cleared by the deminer. Out of five mines laid only one M14 AP mine has been recovered from this FT. The team leader was trying to recheck the cleared area again with the metal detector trying to find the missing mine, during his QA check he stepped on one deep buried M14 AP mine in the area which has been already checked by the deminer and Team Leader.


Ddasaccident595, Hd-Aid Apr 2010

Ddasaccident595, Hd-Aid

Global CWD Repository

On 9th April 2010 at 10:27 while [the Victim] was working in his clearance lane, busy in excavation drill, the accident happened and caused severe injuries to his right hand (traumatic amputation) and some minor injuries to his neck and nose. His visor was broken down and separated from headband. As per the investigation report, the deminer has breached the SOPs as dug directly down on top of the mine. It is also possible that he tried to work in a bit hurry to increase the progress. As he was fully dressed with PPE, therefore, remained save from other severe …


Ddasaccident625, Hd-Aid Apr 2010

Ddasaccident625, Hd-Aid

Global CWD Repository

We took the safety brief before we start working from the team leader then we entered the field, through the 1st period of work I cleared 3 AP mines from the mixed cluster (AP, AT) in Jaber 1 area, on the 2nd period at 9:11 am I cleared a 3 o’clock mine then moved to 9 o’clock mine, while searching I heard a signal and marked it then looked for it using the light rake but because it’s a hard stony area I used the heavy rake then, while progressing 15 cm from the right side I pulled the rake …


Ddasaccident827, Hd-Aid Mar 2010

Ddasaccident827, Hd-Aid

Global CWD Repository

On the 16th March 2010 at [International demining organisation] task CBU 478, an uncontrolled detonation of a US M series M77 sub-munition occurred while [International demining organisation] searcher [the Victim] was conducting sub-surface instrument search.

[The Victim] sustained fragmentation injuries to his right leg in the thigh and lower leg. When he stood on an unstable rock in his clearance lane, this caused a sub-munition underneath the rock to detonate.

Based on all available evidence, the BOI team concludes that the accident occurred due to the failure of [the Victim] to carry out a sufficient check of the rocks and …


Ddasaccident733, Hd-Aid Mar 2010

Ddasaccident733, Hd-Aid

Global CWD Repository

On 15 March 2010 at 08:55 hrs while [the Victim] was busy in excavation of a detected signal, suddenly the accident happened. As a result the deminer got severe injuries on his face, eyes and his right hand.


Ddasaccident645, Hd-Aid Mar 2010

Ddasaccident645, Hd-Aid

Global CWD Repository

When we arrived to the site the team leader gave us the morning safety brief and he warned us to be very alert about as we work on mine clusters, at 07:30 am I entered my site and the team leader came to direct me to make more space in the clearing area of missing mines, he told me to move to lane one later after finishing my work at the missing mine, lane one is a mixed mine area( has both types of mines M15 and M14 ) and asked me to clear M14 mines because the anti tank …


Ddasaccident593, Hd-Aid Feb 2010

Ddasaccident593, Hd-Aid

Global CWD Repository

According to the investigation report the de-miner was using the scraper direct on the top of the detected signal causing it to go off. It was then found that the exploded item was a MUV fuse. As a result of the explosion, [MUV fuze] sustained injuries on his eyes, right side ear, arm and head; the injuries indicate that the de-miner was not using his visor properly.


Ddasaccident678, Hd-Aid Feb 2010

Ddasaccident678, Hd-Aid

Global CWD Repository

The Deminer was trying to check signal using the heavy rake, the M14 mine was laid in a grassy solid ground full of grass root and stones, the deminer tried to drew the grass by the heavy rake, the roots of the grass push the pressure plate of the mine, that cause the mine to blast.


Ddasaccident666, Hd-Aid Feb 2010

Ddasaccident666, Hd-Aid

Global CWD Repository

The deminer was trying to clear the AP mine in a cluster, there was no signal due to the depth of the mines, she asked the team leader to help her in finding the signal, he tried and started to excavate until he found signal, he located and excavated over the signal until he reached 20 cm depth at that time he hit the M14 mine and caused the detonation


Ddasaccident653, Hd-Aid Feb 2010

Ddasaccident653, Hd-Aid

Global CWD Repository

The Deminer today was officiated as a team leader due to the absence of the team leader. He took one deminer tools and started to work himself in one of the remaining cluster in his section. While he was using the grass cutter to cut the grass in front of the base stick he hit the barely covered M14 mine by the grass cutter which caused the mine to initiate.


Ddasaccident599, Hd-Aid Feb 2010

Ddasaccident599, Hd-Aid

Global CWD Repository

After I recovered the main mine (AT M19) and AP mine M14 (12 o’clock direction) I started to recover AP mine M14 (3 o’clock direction) and after a while, I heard a signal, then I applied the standard procedures to investigate the signal and during my approach to the centre of the signal by the heavy rake, AP mine blew up and I did not fell down on the ground and I did not feel any type of pain, then I saw the TL coming to my site and I was just waiting for him to come, after TL reached …