Open Access. Powered by Scholars. Published by Universities.®

Physics Commons

Open Access. Powered by Scholars. Published by Universities.®

Old Dominion University

2012

Geometry

Articles 1 - 2 of 2

Full-Text Articles in Physics

Development Of Superconducting 500 Mhz Multi-Spoke Cavity For Electron Linacs, Dmitry Gorelov, Charles H. Boulware, Terry Grimm, Jean R. Delayen, C. S. Hopper, R. G. Olgave, Subashini U. De Silva Jan 2012

Development Of Superconducting 500 Mhz Multi-Spoke Cavity For Electron Linacs, Dmitry Gorelov, Charles H. Boulware, Terry Grimm, Jean R. Delayen, C. S. Hopper, R. G. Olgave, Subashini U. De Silva

Physics Faculty Publications

Multi-spoke cavities are well-known options for acceleration of heavy and light ions. A recently developed multi-spoke cavity for β=1 presents an attractive opportunity to use this cavity type for electron accelerators. One of the main attractive features of this cavity type is its compactness for relatively low frequency. A simplified design at 500 MHz allowed building of a multi-spoke cavity and cryomodule in a 2-year time frame with confidence and development of effective manufacturing techniques. It also constitutes an important step in proving the usefulness of this kind of cavity design for new applications in the electron machines. Niowave is …


Characteristics And Fabrication Of A 499 Mhz Superconducting Deflecting Cavity For The Jefferson Lab 12 Gev Upgrade, Hyekyoung Park, Subashini U. De Silva, Jean R. Delayen Jan 2012

Characteristics And Fabrication Of A 499 Mhz Superconducting Deflecting Cavity For The Jefferson Lab 12 Gev Upgrade, Hyekyoung Park, Subashini U. De Silva, Jean R. Delayen

Physics Faculty Publications

A 499 MHz parallel bar superconducting deflecting cavity has been designed and optimized [1,2] for a possible implementation at the Jefferson Lab. Previously the mechanical analysis [3], mainly stress, was performed. Since then pressure sensitivity was studied further and the cavity parts were fabricated. The prototype cavity is not completed due to the renovation at Jefferson Lab which resulted in the temporary shutdown of the electron beam welding facility. This paper will present the analysis results and facts encountered during fabrication. The unique geometry of the cavity and its required mechanical strength present interesting manufacturing challenges.