Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch Oct 2007

Ocena Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch

Robert Oleniacz

The work presents air quality impact assessment for the planned Municipal Solid Waste Incineration (MSWI) plant in Krakow with a established capacity of 255000 tons per year. The evaluation is based on assumption that air pollutant emissions from the incinerator will be at the highest allowed level resulting from emission limit values for waste incineration plants with operation time each of two planned lines 7500 hours per year. Calculation results for the one of the considered localization of the MSWI plant in Krakow (district of Nowa Huta) support the thesis that building the incineration plant of this size will not …


Analiza Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch Jan 2007

Analiza Wpływu Planowanego Zakładu Termicznego Przekształcania Odpadów Komunalnych Na Jakość Powietrza W Krakowie, Robert Oleniacz, Maria Pilch

Robert Oleniacz

Construction of the Municipal Solid Waste Incineration (MSWI) plant is considered optimal in the Programme of Management of Solid Waste in Krakow as well as in proposed scenarios of Municipal Waste Management. Evaluation of impact of the incineration plant with a capacity of 255000 tons per year on air quality in Krakow is presented in this work. The evaluation is based on assumption that air pollutant emissions from the incinerator will be at the highest allowed level resulting from emission limit values for waste incineration plants with operation time each of two planned lines 7500 hours per year. Calculation results …