Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

2012

Utah State University

Canyon

Articles 1 - 2 of 2

Full-Text Articles in Environmental Sciences

Bottom Canyon Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management Oct 2012

Bottom Canyon Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

The purpose of the Bottom Canyon Hazardous Fuel Reduction Phase II project is to reduce the buildup of hazardous fuels that have accumulated over the last several decades in order to prevent the potential for large catastrophic fire events. In addition, the proposed action is needed to maintain important sage-steppe habitat for a variety of wildlife species in the project area.


Kings Canyon To Alger Pass Pipeline Project, Project No. Utu-82322, United States Department Of The Interior, Bureau Of Land Management Jan 2012

Kings Canyon To Alger Pass Pipeline Project, Project No. Utu-82322, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

XTO has requested their existing Temporary Use Permit (UTU-82322-01), which authorizes an existing 8 inch, surface, steel, and natural gas pipeline be converted to a permanent right-of-way grant. In addition, XTO proposes to remove a portion of the existing pipeline and to install an additional 15,075 feet of 12 inch, buried, natural gas pipe line to re-direct the flow of gas. XTO has constructed a natural gas compressor plant (Wild Horse Bench Compressor Site) on Ute Tribal land and would like to redirect the flow of gas from the Kings Canyon Area to this facility which involves the removal of …