Bottom Canyon Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management Oct 2012

Bottom Canyon Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

The purpose of the Bottom Canyon Hazardous Fuel Reduction Phase II project is to reduce the buildup of hazardous fuels that have accumulated over the last several decades in order to prevent the potential for large catastrophic fire events. In addition, the proposed action is needed to maintain important sage-steppe habitat for a variety of wildlife species in the project area.


Gasco Production Company Proposes To Drill 6 Oil Wells From 6 Existing Well Pads, United States Department Of The Interior, Bureau Of Land Management Oct 2012

Gasco Production Company Proposes To Drill 6 Oil Wells From 6 Existing Well Pads, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

This Environmental Assessment (EA) has been prepared to analyze the potential impacts of GASCO Production Company (GASCO) oil well drilling project in the 8 Mile Flat area of Uintah County, Utah. GASCO has a valid existing right to extract mineral resources from federal leases UTU-16544, UTU-76262, UTU-75090 & UTU-78433 subject to the lease's terms and conditions. The BLM oil and gas leasing program encourages development of domestic oil and gas reserves and the reduction of U.S. dependence on foreign energy sources.


Moonshine Ridge Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management Oct 2012

Moonshine Ridge Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

The purpose of the Moonshine Ridge Hazardous Fuel Reduction Phase II project is to reduce the buildup of hazardous fuels that have accumulated over the last several decades in order to prevent the potential for large catastrophic fire events. In addition, the proposed action is needed to maintain important sage-steppe habitat for a variety of wildlife species in the project area.


Pine Springs Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management Aug 2012

Pine Springs Hazardous Fuel Reduction Phase Ii, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

The purpose of the Pine Springs Hazardous Fuel Reduction Phase II project is to reduce the buildup of hazardous fuels that have accumulated over the last several decades in order to prevent the potential for large catastrophic fire events. In addition, the proposed action is needed to maintain important sage-steppe habitat for a variety of wildlife species in the project area.


Cochrane Resources Proposes To Drill One New Natural Gas Well, The Horse Point Federal Well 12-13, United States Department Of The Interior, Bureau Of Land Management May 2012

Cochrane Resources Proposes To Drill One New Natural Gas Well, The Horse Point Federal Well 12-13, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

This Environmental Assessment (EA) has been prepared to analyze Cochrane Resources proposal to drill one new natural gas well. The access road and pipeline would be within the Horse Point Lease boundary and would not need a right-of-way.


Kings Canyon To Alger Pass Pipeline Project, Project No. Utu-82322, United States Department Of The Interior, Bureau Of Land Management Jan 2012

Kings Canyon To Alger Pass Pipeline Project, Project No. Utu-82322, United States Department Of The Interior, Bureau Of Land Management

Environmental Assessments (UT)

XTO has requested their existing Temporary Use Permit (UTU-82322-01), which authorizes an existing 8 inch, surface, steel, and natural gas pipeline be converted to a permanent right-of-way grant. In addition, XTO proposes to remove a portion of the existing pipeline and to install an additional 15,075 feet of 12 inch, buried, natural gas pipe line to re-direct the flow of gas. XTO has constructed a natural gas compressor plant (Wild Horse Bench Compressor Site) on Ute Tribal land and would like to redirect the flow of gas from the Kings Canyon Area to this facility which involves the removal of …