Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Water Resource Management

Department of Primary Industries and Regional Development, Western Australia

Geology

Articles 61 - 66 of 66

Full-Text Articles in Physical Sciences and Mathematics

Groundwater Study Of The Pingrup Townsite, D Pollock, Department Of Agriculture, Western Australia, Louise Hopgood, F Lewis, Ali S. Mahtab, Anthony D. Barr, Muhammad J. Siddiqi, Ron Colman Jan 2001

Groundwater Study Of The Pingrup Townsite, D Pollock, Department Of Agriculture, Western Australia, Louise Hopgood, F Lewis, Ali S. Mahtab, Anthony D. Barr, Muhammad J. Siddiqi, Ron Colman

Resource management technical reports

A groundwater study was carried out in the townsite of Pingrup. It aimed to accelerate the implementation of effective salinity risk management. The study consisted of a drilling investigation and expansion of a piezometer network, a pumping test, groundwater flow modelling and a flood risk analysis.


Blackwood Catchment : Katanning Zone (Zone 6) : Catchment Appraisal 2001, Henry Brockman, Blackwood Rapid Catchment Appraisal Team (Wa) Jan 2001

Blackwood Catchment : Katanning Zone (Zone 6) : Catchment Appraisal 2001, Henry Brockman, Blackwood Rapid Catchment Appraisal Team (Wa)

Resource management technical reports

The aim of this report is to document the extent of salinity and land degradation within the Katanning zone, Western Australia, and management options aimed at reducing recharge and land degradation.


A Conceptual Hydrogeological Model For The Lake Warden Recovery Catchments Esperance, Western Australia, R Short May 2000

A Conceptual Hydrogeological Model For The Lake Warden Recovery Catchments Esperance, Western Australia, R Short

Resource management technical reports

The National Land and Water Resource Audit (NLWRA), has identified Dryland Salinity as one of seven major themes for an audit of the nation’s land, water, vegetation and natural resource management. Within this theme, Project 3 has been developed to investigate a key catchment type and how management scenarios will impact on dryland salinity processes. The Lake Warden catchments have been chosen as one of four catchment water balance studies to be undertaken nationally. The catchment water balance analysis will be undertaken using numerical modelling by the CSIRO, Division of Land and Water.


Investigation Of The Role Of The Urella Fault And The Impact Of Salinity Development In The Nebru Catchment, Upper Arrowsmith, C E. Mcconnell Jan 2000

Investigation Of The Role Of The Urella Fault And The Impact Of Salinity Development In The Nebru Catchment, Upper Arrowsmith, C E. Mcconnell

Resource management technical reports

No abstract provided.


The Salinity And Hydrology Of The Upper Slab Hut Catchment, R Ferdowsian, A T. Ryder Aug 1999

The Salinity And Hydrology Of The Upper Slab Hut Catchment, R Ferdowsian, A T. Ryder

Resource management technical reports

No abstract provided.


Evaluation Of Deep, Open Drains In The North Stirling Area, R Ferdowsian, A T. Ryder, J Kelly Apr 1997

Evaluation Of Deep, Open Drains In The North Stirling Area, R Ferdowsian, A T. Ryder, J Kelly

Resource management technical reports

No abstract provided.