Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 5 of 5

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Fault-Tolerant Method And Simulation Of Heterogeneous Multi-Core Processor Based On Speculative Mechanism, Shigan Yu, Zhimin Tang, Xiaochun Ye, Dongrui Fan Dec 2019

Fault-Tolerant Method And Simulation Of Heterogeneous Multi-Core Processor Based On Speculative Mechanism, Shigan Yu, Zhimin Tang, Xiaochun Ye, Dongrui Fan

Journal of System Simulation

Abstract: Heterogeneous multicore is one of the important branches of processors,but they are still faced with frequent transient failures. TMR(Triple mode redundancy) is the main method to solve transient faults, which has the characteristics of low efficiency and high power consumption, a high-performance Fault-Tolerant Scheduling Algorithm with Speculative mechanism(FTSAS) is proposed. Each heterogeneous core can execute tasks independently, the state values of the first completed core are recorded, and the first completed core continues to perform the next task with forward speculative method. The results are compared by backward core, the majority consensus principle is adopted to ensure the reliability …


Cloud Job Scheduling Model Based On Improved Plant Growth Algorithm, Li Qiang, Xiaofeng Liu Jan 2019

Cloud Job Scheduling Model Based On Improved Plant Growth Algorithm, Li Qiang, Xiaofeng Liu

Journal of System Simulation

Abstract: The performance of cloud job scheduling algorithm has a great importance to the whole cloud system. The key factors that affect cloud operation scheduling are found out, and a resource constraint model is established. The existing simulation plant growth algorithm is improved based on the Logistic model of plant growth law, so that the plant growth way was made to change according to the energy power. The comparison of four different plant models was carried out and their different features were analyzed. Compared with 6 typical cloud job scheduling algorithms, it is concluded that the improved simulation plant growth …


Optimization Of Scheduling Rule Of Unidirectional Material Handling System With Short-Cut, Juntao Li, Kun Xia, Kise Hiroshi Jan 2019

Optimization Of Scheduling Rule Of Unidirectional Material Handling System With Short-Cut, Juntao Li, Kun Xia, Kise Hiroshi

Journal of System Simulation

Abstract: To decrease the interference and improve the performance of a unidirectional circulation-type material handling system on a single loop with a shortcut, the interference and scheduling problem between AGVs are studied. According to the actual situation of material handling system, the interferences of two scheduling rules (random rule and order rule) are analyzed. An optimal scheduling rule under the interference case—exchange order rule is proposed. Different scheduling rules have an influence on the interference between AGVs and then have an important effect on the efficiency of the whole system. Experiment results show that the exchange order (E-Order) rule …


Sky Surveys Scheduling Using Reinforcement Learning, Andres Felipe Alba Hernandez Jan 2019

Sky Surveys Scheduling Using Reinforcement Learning, Andres Felipe Alba Hernandez

Graduate Research Theses & Dissertations

Modern cosmic sky surveys (e.g., CMB S4, DES, LSST) collect a complex diversity of astronomical objects. Each of class of objects presents different requirements for observation time and sensitivity. For determining the best sequence of exposures for mapping the sky systematically, conventional scheduling methods do not optimize the use of survey time and resources. Dynamic sky survey scheduling is an NP-hard problem that has been therefore treated primarily with heuristic methods. We present an alternative scheduling method based on reinforcement learning (RL) that aims to optimize the use of telescope resources for scheduling sky surveys.

We present an exploration of …


Pharmaceutical Scheduling Using Simulated Annealing And Steepest Descent Method, Bryant Jamison Spencer Jan 2019

Pharmaceutical Scheduling Using Simulated Annealing And Steepest Descent Method, Bryant Jamison Spencer

Graduate Theses, Dissertations, and Problem Reports

In the pharmaceutical manufacturing world, a deadline could be the difference between losing a multimillion-dollar contract or extending it. This, among many other reasons, is why good scheduling methods are vital. This problem report addresses Flexible Flowshop (FF) scheduling using Simulated Annealing (SA) in conjunction with the Steepest Descent heuristic (SD).

FF is a generalized version of the flowshop problem, where each product goes through S number of stages, where each stage has M number of machines. As opposed to a normal flowshop problem, all ‘jobs’ do not have to flow in the same sequence from stage to stage. The …