Finding Robust-Under-Risk Solutions For Flowshop Scheduling, Steven O. Kimbrough, Ann Kuo, Hoong Chuin Lau Jul 2011

Finding Robust-Under-Risk Solutions For Flowshop Scheduling, Steven O. Kimbrough, Ann Kuo, Hoong Chuin Lau

Research Collection School Of Computing and Information Systems

We propose and explore, in the context of benchmark problems for flowshop scheduling, a risk-based concept of robustness for optimization problems. This risk-based concept is in distinction to, and complements, the uncertainty-based concept employed in the field known as robust optimization. Implementation of our concept requires problem solution methods that sample the solution space intelligently and that produce large numbers of distinct sample points. With these solutions to hand, their robustness scores are easily obtained and heuristically robust solutions found. We find evolutionary computation to be effective for this purpose on these problems.


Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez Apr 2011

Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez

Engineering Management & Systems Engineering Theses & Dissertations

The majority of scheduling research deals with problems in specific production environments with specific objective functions. However, in many cases, more than one problem type and/or objective function exists, resulting in the need for a more generic and flexible system to generate schedules. Furthermore, most of the published scheduling research focuses on creating an optimal or near optimal initial schedule during the planning phase. However, after production processes start, circumstances like machine breakdowns, urgent jobs, and other unplanned events may render the schedule suboptimal, obsolete or even infeasible resulting in a "rescheduling" problem, which is typically also addressed for a …