Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 6 of 6

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Scheduling, Complexity, And Solution Methods For Space Robot On-Orbit Servicing, Susan E. Sorenson Aug 2022

Scheduling, Complexity, And Solution Methods For Space Robot On-Orbit Servicing, Susan E. Sorenson

Graduate Theses and Dissertations

This research proposes problems, models, and solutions for the scheduling of space robot on-orbit servicing. We present the Multi-Orbit Routing and Scheduling of Refuellable On-Orbit Servicing Space Robots problem which considers on-orbit servicing across multiple orbits with moving tasks and moving refuelling depots. We formulate a mixed integer linear program model to optimize the routing and scheduling of robot servicers to accomplish on-orbit servicing tasks. We develop and demonstrate flexible algorithms for the creation of the model parameters and associated data sets. Our first algorithm creates the network arcs using orbital mechanics. We have also created a novel way to …


Sky Surveys Scheduling Using Reinforcement Learning, Andres Felipe Alba Hernandez Jan 2019

Sky Surveys Scheduling Using Reinforcement Learning, Andres Felipe Alba Hernandez

Graduate Research Theses & Dissertations

Modern cosmic sky surveys (e.g., CMB S4, DES, LSST) collect a complex diversity of astronomical objects. Each of class of objects presents different requirements for observation time and sensitivity. For determining the best sequence of exposures for mapping the sky systematically, conventional scheduling methods do not optimize the use of survey time and resources. Dynamic sky survey scheduling is an NP-hard problem that has been therefore treated primarily with heuristic methods. We present an alternative scheduling method based on reinforcement learning (RL) that aims to optimize the use of telescope resources for scheduling sky surveys.

We present an exploration of …


Pharmaceutical Scheduling Using Simulated Annealing And Steepest Descent Method, Bryant Jamison Spencer Jan 2019

Pharmaceutical Scheduling Using Simulated Annealing And Steepest Descent Method, Bryant Jamison Spencer

Graduate Theses, Dissertations, and Problem Reports

In the pharmaceutical manufacturing world, a deadline could be the difference between losing a multimillion-dollar contract or extending it. This, among many other reasons, is why good scheduling methods are vital. This problem report addresses Flexible Flowshop (FF) scheduling using Simulated Annealing (SA) in conjunction with the Steepest Descent heuristic (SD).

FF is a generalized version of the flowshop problem, where each product goes through S number of stages, where each stage has M number of machines. As opposed to a normal flowshop problem, all ‘jobs’ do not have to flow in the same sequence from stage to stage. The …


Scheduling And Resource Allocation In Wireless Sensor Networks, Yosef Alayev Feb 2014

Scheduling And Resource Allocation In Wireless Sensor Networks, Yosef Alayev

Dissertations, Theses, and Capstone Projects

In computer science and telecommunications, wireless sensor networks are an active research area. Each sensor in a wireless sensor network has some pre-defined or on demand tasks such as collecting or disseminating data. Network resources, such as broadcast channels, number of sensors, power, battery life, etc., are limited. Hence, a schedule is required to optimally allocate network resources so as to maximize some profit or minimize some cost. This thesis focuses on scheduling problems in the wireless sensor networks environment. In particular, we study three scheduling problems in the wireless sensor networks: broadcast scheduling, sensor scheduling for area monitoring, and …


Meta-Heuristics Analysis For Technologically Complex Programs: Understanding The Impact Of Total Constraints For Schedule, Quality And Cost, Henry Darrel Webb Jul 2012

Meta-Heuristics Analysis For Technologically Complex Programs: Understanding The Impact Of Total Constraints For Schedule, Quality And Cost, Henry Darrel Webb

Engineering Management & Systems Engineering Projects for D. Eng. Degree

Program management data associated with a technically complex radio frequency electronics base communication system has been collected and analyzed to identify heuristics which may be utilized in addition to existing processes and procedures to provide indicators that a program is trending to failure. Analysis of the collected data includes detailed schedule analysis, detailed earned value management analysis and defect analysis within the framework of a Firm Fixed Price (FFP) incentive fee contract.

This project develops heuristics and provides recommendations for analysis of complex project management efforts such as those discussed herein. The analysis of the effects of the constraints on …


Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez Apr 2011

Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez

Engineering Management & Systems Engineering Theses & Dissertations

The majority of scheduling research deals with problems in specific production environments with specific objective functions. However, in many cases, more than one problem type and/or objective function exists, resulting in the need for a more generic and flexible system to generate schedules. Furthermore, most of the published scheduling research focuses on creating an optimal or near optimal initial schedule during the planning phase. However, after production processes start, circumstances like machine breakdowns, urgent jobs, and other unplanned events may render the schedule suboptimal, obsolete or even infeasible resulting in a "rescheduling" problem, which is typically also addressed for a …