Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Publication
Articles 1 - 4 of 4
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Managing Strategic Intellectual Property Assets In The Fuzzy Front End Of New Product Development Process, Yonghee Cho, Tugrul U. Daim
Managing Strategic Intellectual Property Assets In The Fuzzy Front End Of New Product Development Process, Yonghee Cho, Tugrul U. Daim
Joseph Cho
The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Kamran Shahanaghi, Mehdi Jafarian, Majid Beikverdi, Zeinab Nezhadbiglari
The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Kamran Shahanaghi, Mehdi Jafarian, Majid Beikverdi, Zeinab Nezhadbiglari
Mehdi Jafarian
The last step of a condition based maintenance (CBM) program is maintenance decision-making. This step is the most important and the most critical stage of maintenance for executive personnel and management whom work on taking maintenance actions. This decision making would be done according to certain criteria such as risk, cost, reliability and availability. This paper considered a dynamic programming model to optimization of the threshold for the preventive maintenance actions in a condition-based maintenance program. The basis of this modeling is the average cost of maintenance actions, failures and exchanges. In this paper, we improved the memory of the …
The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Mehdi Jafarian, Majid Beikverdi, Kamran Shahanaghi, Zeinab Nezhadbiglari
The Optimization Of The Threshold For The Preventive Maintenance Actions In A Condition-Based Maintenance Program Via Dynamic Programming Approach, Mehdi Jafarian, Majid Beikverdi, Kamran Shahanaghi, Zeinab Nezhadbiglari
Mehdi Jafarian
The last step of a condition based maintenance (CBM) program is maintenance decision-making. This step is the most important and the most critical stage of maintenance for executive personnel and management whom work on taking maintenance actions. This decision making would be done according to certain criteria such as risk, cost, reliability and availability. This paper considered a dynamic programming model to optimization of the threshold for the preventive maintenance actions in a condition-based maintenance program. The basis of this modeling is the average cost of maintenance actions, failures and exchanges. In this paper, we improved the memory of the …
Neuro-Physiologically-Driven Adaptive Automation To Improve Decision Making Under Stress, Michael C. Dorneich, Patricia May Ververs, Stephen D. Whitlow, Santosh Mathan, James Carciofini, Trent Reusser
Neuro-Physiologically-Driven Adaptive Automation To Improve Decision Making Under Stress, Michael C. Dorneich, Patricia May Ververs, Stephen D. Whitlow, Santosh Mathan, James Carciofini, Trent Reusser
Michael C. Dorneich
The advent of netted communications and a wide array of battlefield sensors is enabling real-time information streaming and asset management. However, the burden of information management is placed solely on the receiver of the information. Honeywell Laboratories developed a Communications Scheduler (CoS), an adaptive information management system for the dismounted Soldier, driven by an assessment of the individual's current cognitive capacity to process incoming information, in order to improve decision making under high task load conditions. An evaluation was conducted to demonstrate whether cognitive capacity to perform under differing task loads could be detected using neuro-physiological sensors and then if …