Articles 1 - 5 of 5

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Size And Cost Reduction Of The Antenna 3000, Mario Mignott, Austin Deaver, Josh Madaris Dec 2020

Size And Cost Reduction Of The Antenna 3000, Mario Mignott, Austin Deaver, Josh Madaris

Senior Design Project For Engineers

For our senior design project, we have partnered with Compass Technology Group to improve its Antenna 3000 manufacturing process. The Antenna we are working on is not actually called this, but due to NDA regulations, we will disguise it as the Antenna 3000. This will include finding a way to minimize material costs and labor hours involved to assemble this product together. Our minimum success criteria will be to reduce both the manufacturing time and materials' cost by 20%. Our primary approach to solving this problem will be to implement Lean Six Sigma practices such as the DMAIC principle.

Using …


Flexibly Serving A Finite Number Of Heterogeneous Jobs In A Tandem System, Yun Fong Lim, Bingnan Lu, Rowan Wang, Wenjia Zhang Jun 2020

Flexibly Serving A Finite Number Of Heterogeneous Jobs In A Tandem System, Yun Fong Lim, Bingnan Lu, Rowan Wang, Wenjia Zhang

Research Collection Lee Kong Chian School Of Business

Many manufacturing and service systems require a finite number of heterogeneous jobs to be processed by two stations in tandem. Each station serves at most one job at a time and there is a finite buffer between the two stations. We consider two flexible servers that are cross-trained to work at both stations. The duration for a server to finish a job at a station is exponentially distributed with a rate that depends on the server, the station, and the job. Our goal is to identify an efficient policy to dynamically assign the servers to the stations such that the …


Product Realization Capstone: Element Proof Safety Steps For Willie Price Lab School, Catherine Thomas, Allan Heuerman, Jared Mumme May 2020

Product Realization Capstone: Element Proof Safety Steps For Willie Price Lab School, Catherine Thomas, Allan Heuerman, Jared Mumme

Honors Theses

The purpose of this document is to describe the process we took to complete our capstone which paired the Center for Manufacturing Excellence with the Willie Price Lab School. The goal of the capstone was to remake step stools for the students of Willie Price, as the last stools failed to withstand weather damage. However, with the COVID-19 pandemic, plans were hindered, shifting the goal from actually producing the steps to creating instructions so that a younger Center for Manufacturing class could complete the production at a later date. Standardized Work Instructions, a detailed production plan, and engineering drawings were …


A Reinforcement Learning Approach To Sequential Acceptance Sampling As A Critical Success Factor For Lean Six Sigma, Hani A. Khalil May 2020

A Reinforcement Learning Approach To Sequential Acceptance Sampling As A Critical Success Factor For Lean Six Sigma, Hani A. Khalil

Theses and Dissertations

In the 21st century, globalization coupled with technological advancement and free trade has created competition among various businesses enterprises. This competition has led many businesses to adopt various management techniques such as acceptance sampling aimed at transforming their processes in order to remain competitive in the global market and adapt to new market demands. The successful implementation of acceptance sampling is highly dependent on what the academic literature refers to as acceptance sampling optimization. A literature review on the optimization of acceptance sampling has not shown any work that studied whether acceptance sampling and machine learning (ML) plans can be …


Itw Deltar Model Factory, Bri Hollowell, Tyler Rogers, Jake Klingelsmith Apr 2020

Itw Deltar Model Factory, Bri Hollowell, Tyler Rogers, Jake Klingelsmith

Scholar Week 2016 - present

The project given to the design team was a request from ITW Deltar to improve their packaging system for some production machines in cell C. The primary goal of the project is to optimize the safety and workflow of the packaging systems in cell C. The safety of the packaging system will be determined using the REBA risk assessment number. The workflow improvement is determined through analysis of the packaging time and the walking distances of the workers.

The design team identified the functional requirements and design constraints that need to be met. These functional requirements include the packaging system …