Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Recording Of Elevated Temperature Fatigue Crack Growth Data By Dcpd System, N. Ramachandran, N. Arakere, Tarun Goswami May 2011

Recording Of Elevated Temperature Fatigue Crack Growth Data By Dcpd System, N. Ramachandran, N. Arakere, Tarun Goswami

Biomedical, Industrial & Human Factors Engineering Faculty Publications

The growth of "long" fatigue cracks, in α-β titanium alloy forging, subjected to cyclic stresses, is studied in this paper. The fatigue crack growth rate (FCGR) data were recorded at room temperature, 350, 450, 550 and 650°F using the Direct Current Potential Difference (DCPD) technique. The DCPD method, used in this investigation, was found to record and correlate the potential difference in terms of crack growth rate (da/dN) and Mode I stress intensity factor range satisfactorily. Various factors related to error minimization and calibration equations for compact tension specimens have been elaborated. Also discussed were the means to enhance the …


Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu May 2011

Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu

Masters Theses

A model to analyze lean systems reliability is developed based on the premises that lean production systems require four primary resources; materials, equipment, personnel, and schedule (Sawhney, R., Subburaman, K., Sonntag, C., Capizzi, C. and Rao, P.V., 2009). The four primary lean resources were independently analyzed, without due consideration to underlying relationships within each other. In this research, relationships and interaction between root-causes and lean primary resources were conceptualized and developed. The development applied a five-phase approach: 1. review of related literature, 2. decompositions of lean primary resources, 3. selection of consensus root causes items and questionnaire construct, 4. survey …


The Role Of Conflict Management On Virtual Team Performance And Satisfaction, Pilar Pazos, Anil Ustun, Rolando Delaguila Jan 2011

The Role Of Conflict Management On Virtual Team Performance And Satisfaction, Pilar Pazos, Anil Ustun, Rolando Delaguila

Engineering Management & Systems Engineering Faculty Publications

The role that input factors from project planning processes play on conflict emergence and conflict resolution in virtual teams is not well understood. Of particular interest for this paper is the role that factors during planning stages play in preventing interpersonal conflict, supporting conflict resolution and ultimately enhancing team outcomes in virtual team settings. This study examines the relationships among commitment to team goals, conflict management and team outcomes in virtual teams. First we provide an in depth review of relevant empirical findings. Next, we describe a study examining the relationships between three sets of variables: 1) goal commitment, 2) …