Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Resource Assignment In Short Life Technology Intensive (Slti) New Product Development (Npd), Randy A. Reagan Jan 2010

Resource Assignment In Short Life Technology Intensive (Slti) New Product Development (Npd), Randy A. Reagan

Dissertations

Enterprises managing multiple concurrent New Product Development (NPD) projects face significant challenges assigning staff to projects in order to achieve launch schedules that maximize financial returns. The challenge is increased with the class of Short Life Technology Intensive (SLTI) products characterized by technical complexity, short development cycles and short revenue life cycles. Technical complexity drives the need to assign staffing resources of various technical disciplines and skill levels. SLTI products are rapidly developed and launched into stationary market windows where the revenue life cycle is short and decreasing with any time-to-market delay. The SLTI-NPD project management decision is to assign …


Project And Risk Management: A Systematic Approach, Baqer Alali, C. Ariel Pinto, Andreas Tolk, Rafael Landaeta Jan 2010

Project And Risk Management: A Systematic Approach, Baqer Alali, C. Ariel Pinto, Andreas Tolk, Rafael Landaeta

Engineering Management & Systems Engineering Faculty Publications

The main purpose of this paper is to discuss three related topics of project management, systems management, and risk management. The issue that would be addressed in this paper is how risks are addressed in project and systems management, and how risks are propagated between projects and systems. A framework is proposed to overcome the problem of risk propagation from project to the systems. It was shown that the proposed framework can be deployed to existing risk management process with reasonable interventions (e.g. process prescribed by PMI). Finally a proof-of-concept application shows potential of the framework for various types of …