Dynamic Lot Sizing And Scheduling In A Multi-Item Production System, Padmanabhan Soundar Apr 1996

Dynamic Lot Sizing And Scheduling In A Multi-Item Production System, Padmanabhan Soundar

Engineering Management & Systems Engineering Theses & Dissertations

In this research, algorithms are developed to address the problem of dynamic lot sizing and scheduling in a single level (or single operation) production system. This research deviates from previous research in this area in that it does not have the kind of assumptions regarding the real world production system that normally were made to reduce the complexity of the problem. Specifically, this research explicitly considers finite capacity, multiple items, known deterministic dynamic demand, sequence dependent setup times and setup costs, setup carryover and variable backlogging. The objective is to simultaneously determine the lot size and the sequence of production …