Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Barge Prioritization, Assignment, And Scheduling During Inland Waterway Disruption Responses, Liliana Delgado-Hidalgo Aug 2018

Barge Prioritization, Assignment, And Scheduling During Inland Waterway Disruption Responses, Liliana Delgado-Hidalgo

Graduate Theses and Dissertations

Inland waterways face natural and man-made disruptions that may affect navigation and infrastructure operations leading to barge traffic disruptions and economic losses. This dissertation investigates inland waterway disruption responses to intelligently redirect disrupted barges to inland terminals and prioritize offloading while minimizing total cargo value loss. This problem is known in the literature as the cargo prioritization and terminal allocation problem (CPTAP). A previous study formulated the CPTAP as a non-linear integer programming (NLIP) model solved with a genetic algorithm (GA) approach. This dissertation contributes three new and improved approaches to solve the CPTAP.

The first approach is a decomposition …


The Developmental Test Scheduling Problem, Joseph E. Schoenbeck Mar 2018

The Developmental Test Scheduling Problem, Joseph E. Schoenbeck

Theses and Dissertations

Developmental testing of aircraft systems in the United States Air Force requires a complex set of resources for each test. The optimal scheduling of those resources is the job of the 412th Test Wing at Edwards Air Force Base. With more than 20 different Combined Task Forces requesting resources for roughly 300 flying missions each week, manual scheduling is a difficult task. The current process takes a team of schedulers several days to get a workable result from which they can start tailoring the final schedule. While concepts and techniques can be taken from industry scheduling problems, the body of …