Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan
Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan
Engineering Management & Systems Engineering Theses & Dissertations
The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for fighter aircrafts (jobs) on multiple tankers (machines) to minimize the total weighted tardiness. ARSP can be modeled as a parallel machine scheduling with release times and due date-to-deadline window. ARSP assumes that the jobs have different release times, due dates, and due date-to-deadline windows between the refueling due date and a deadline to return without refueling. The Aerial Refueling Rescheduling Problem (ARRP), on the other hand, can be defined as updating the existing AR schedule after being disrupted by job related events including the …
Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez
Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez
Engineering Management & Systems Engineering Theses & Dissertations
The majority of scheduling research deals with problems in specific production environments with specific objective functions. However, in many cases, more than one problem type and/or objective function exists, resulting in the need for a more generic and flexible system to generate schedules. Furthermore, most of the published scheduling research focuses on creating an optimal or near optimal initial schedule during the planning phase. However, after production processes start, circumstances like machine breakdowns, urgent jobs, and other unplanned events may render the schedule suboptimal, obsolete or even infeasible resulting in a "rescheduling" problem, which is typically also addressed for a …