Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Ecological Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Ecological Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.