Architecture

Hydroelectric power plants

Articles 1 - 12 of 12

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1980

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley Jan 1977

Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley

Dickey-Lincoln School Lakes Project

The construction of the Dickey-Lincoln Hydroelectric Project. To examine, in depth, the proposal and its impact as seen by various segments of our society. The report will identify the factors that must carry the main weight in making a final determination.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division Jan 1967

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 Hydrology And Hydraulic Analysis: Section 1 - Climatology And Stream Flow, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

This section I is the first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of …