Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Predictive Power And Validity Of Connectome Predictive Modeling: A Replication And Extension, Michael Wang, Joaquin Goni, Enrico Amico Aug 2017

Predictive Power And Validity Of Connectome Predictive Modeling: A Replication And Extension, Michael Wang, Joaquin Goni, Enrico Amico

The Summer Undergraduate Research Fellowship (SURF) Symposium

Neuroimaging, particularly functional magnetic resonance imaging (fMRI), is a rapidly growing research area and has applications ranging from disease classification to understanding neural development. With new advancements in imaging technology, researchers must employ new techniques to accommodate the influx of high resolution data sets. Here, we replicate a new technique: connectome-based predictive modeling (CPM), which constructs a linear predictive model of brain connectivity and behavior. CPM’s advantages over classic machine learning techniques include its relative ease of implementation and transparency compared to “black box” opaqueness and complexity. Is this method efficient, powerful, and reliable in the prediction of behavioral measures …


A Critical Path Problem Using Triangular Neutrosophic Number, Florentin Smarandache, Mai Mohamed, Yongquan Zhou, Mohamed Abdel-Baset Jul 2017

A Critical Path Problem Using Triangular Neutrosophic Number, Florentin Smarandache, Mai Mohamed, Yongquan Zhou, Mohamed Abdel-Baset

Branch Mathematics and Statistics Faculty and Staff Publications

The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem. In this paper, the proposed method has been made to find the critical path in network diagram, whose activity time uncertain. The vague parameters in the network are represented by triangular neutrosophic numbers, instead of crisp numbers. At the end of paper, two illustrative examples are provided to validate the proposed approach.


Comparing Critical Chain Project Managemenet With Critical Path Method: A Case Study, Behzad Montazeri Apr 2017

Comparing Critical Chain Project Managemenet With Critical Path Method: A Case Study, Behzad Montazeri

Masters Theses & Specialist Projects

Scheduling is a major task in project management. The current scheduling technique, Critical Path Method (CPM), has been widely applied for several decades, but a large number of projects fail to be completed on time and schedule delays occur in many projects. This raises question about the validity of the current project scheduling system. Critical Chain Project Management (CCPM), derived from Theory of Constraints, is a relatively new alternative approach toward scheduling projects. This study compared CCPM and CPM to determine which scheduling method delivers a shorter project duration and has a better usage of resources. A scheduling software called …