Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Scheduling Problem With Drying Requirements, Machine Eligibility Restrictions, Setup Times, And Assembly Requirements For An Injection Molding Facility, Ashley Owens Aug 2023

Scheduling Problem With Drying Requirements, Machine Eligibility Restrictions, Setup Times, And Assembly Requirements For An Injection Molding Facility, Ashley Owens

Doctoral Dissertations

Previous research only focused on an unrelated parallel machine scheduling problem with setup and processing resources. However, some manufacturing environments, such as plastic injection molding, need different sequential and parallel processes before the facility can process jobs in the machines. For example, some raw materials are hygroscopic, and a dryer must remove moisture before being processed in the injection molding machine. These dryers are portrayed as parallel machines. The job rather than the machine determines the drying time. Once the drying stage is complete and the raw materials are transferred to the actual machines to run jobs, the scheduling problem …


Heuristic Solution For Separated Manufacturing Process, James Dee Davis Dec 2015

Heuristic Solution For Separated Manufacturing Process, James Dee Davis

Masters Theses

Downtime is a major issue for manufactures. Downtime may occur from breakdowns, quality issues, lack of manpower, lack of materials, or in this case a lack of storage containers. A manufacturing system was studied that consists of an injection machine that supplies two assembly lines. The injection machine suffered from frequent downtime from lack of containers. The process was analyzed for root cause of downtime. After analysis of the system it was found that the injection process had high variability in production quantity and quality. The scheduling scheme called for production until all available containers were full regardless of actual …