Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 11 of 11

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

A Machine Learning Approach For Predicting Clinical Trial Patient Enrollment In Drug Development Portfolio Demand Planning, Ahmed Shoieb May 2023

A Machine Learning Approach For Predicting Clinical Trial Patient Enrollment In Drug Development Portfolio Demand Planning, Ahmed Shoieb

Masters Theses

One of the biggest challenges the clinical research industry currently faces is the accurate forecasting of patient enrollment (namely if and when a clinical trial will achieve full enrollment), as the stochastic behavior of enrollment can significantly contribute to delays in the development of new drugs, increases in duration and costs of clinical trials, and the over- or under- estimation of clinical supply. This study proposes a Machine Learning model using a Fully Convolutional Network (FCN) that is trained on a dataset of 100,000 patient enrollment data points including patient age, patient gender, patient disease, investigational product, study phase, blinded …


Topology Network Optimization Of Facility Planning And Design Problems, Ravi Ratan Raj Monga Oct 2019

Topology Network Optimization Of Facility Planning And Design Problems, Ravi Ratan Raj Monga

Masters Theses

The research attempts to provide a graphical theory-based approach to solve the facility layout problem. Which has generally been approached using Quadratic Assignment Problem (QAP) in the past, an algebraic method. It is a very complex problem and is part of the NP-Hard optimization class, because of the nonlinear quadratic objective function and (0,1) binary variables. The research is divided into three phases which together provide an optimal facility layout, block plan solution consisting of MHS (material handling solution) projected onto the block plan. In phase one, we solve for the position of departments in a facility based on flow …


A Computational Simulation Model For Predicting Infectious Disease Spread Using The Evolving Contact Network Algorithm, Buyannemekh Munkhbat Jul 2019

A Computational Simulation Model For Predicting Infectious Disease Spread Using The Evolving Contact Network Algorithm, Buyannemekh Munkhbat

Masters Theses

Commonly used simulation models for predicting outbreaks of re-emerging infectious diseases (EIDs) take an individual-level or a population-level approach to modeling contact dynamics. These approaches are a trade-off between the ability to incorporate individual-level dynamics and computational efficiency. Agent-based network models (ABNM) use an individual-level approach by simulating the entire population and its contact structure, which increases the ability of adding detailed individual-level characteristics. However, as this method is computationally expensive, ABNMs use scaled-down versions of the full population, which are unsuitable for low prevalence diseases as the number of infected cases would become negligible during scaling-down. Compartmental models use …


Two Multi-Objective Stochastic Models For Project Team Formation Under Uncertainty In Time Requirements, Fahimeh Rahmanniyay Aug 2017

Two Multi-Objective Stochastic Models For Project Team Formation Under Uncertainty In Time Requirements, Fahimeh Rahmanniyay

Masters Theses

Team formation is one of the key stages in project management. The cost associated with the individuals who form a team and the quality of the tasks completed by the team are two of the main concerns in team formation problems. In this study, two mathematical models to optimize simultaneously cost and quality in a team formation problem are developed. Because team formation problem arises in uncertain environment, different scenarios are defined for the time requirement of the project. Two-stage stochastic programming and multi-stage stochastic programming are applied to solve the first and the second model respectively. The presented models …


A General Code To Represent The Mathematical Life Cycle Cost Model Of Bridge, Bajel Mohammed Alshadeedi Dec 2016

A General Code To Represent The Mathematical Life Cycle Cost Model Of Bridge, Bajel Mohammed Alshadeedi

Masters Theses

There are many factors that play a role in the overall cost of any bridge. The life cycle cost needs deep knowledge of bridge components to calculate its subcategories costs. The bridge life cycle cost is divided into; agency, user cost, and society costs. The agency cost includes the expected value of the final bridge construction cost, the inspection cost, better value of repainting cost, and replacing asphaltic deck cost. The user cost includes traffic delay cost and vehicle operation cost under different traffic conditions, accident cost, and failure cost. The society cost includes aesthetical and environmental impact. All costs …


Strategies For Reducing Supplier Risk: Inputs Into The Supply Chain, Christopher A. Greene Mar 2016

Strategies For Reducing Supplier Risk: Inputs Into The Supply Chain, Christopher A. Greene

Masters Theses

There are many aspects to consider when managing an entire supply chain from procurement to fulfillment. Complex assemblies require hundreds of components, sourced from all corners of the globe, to come together in a synchronized fashion. Given the magnitude of the supply chain, high quality standards, and significantly increased outsourcing, there is a strong need to monitor supplier risk and quickly identify and mitigate potential problems. Moreover, the continuous pressure to reduce resources and pressure to cut costs, further increases the need for the development of procedures and tools that can quickly and efficiently address these potential supply chain risks. …


Simulation Of 48-Hour Queue Dynamics For A Semi-Private Hospital Ward Considering Blocked Beds, Wei Chen Mar 2016

Simulation Of 48-Hour Queue Dynamics For A Semi-Private Hospital Ward Considering Blocked Beds, Wei Chen

Masters Theses

This thesis study evaluates access to care at an internal medicine unit with solely semi-private rooms at Baystate Medical Center (BMC). Patients are divided into two types: Type I patient consumes one bed; Type II patient occupies two beds or an entire semi-private room as a private space for clinical reasons, resulting in one empty but unavailable (blocked) bed per Type II patient. Because little data is available on blocked beds and Type II patients, unit-level hospital bed planning studies that consider blocked beds have been lacking. This thesis study bridges that gap by building a single-stream and a two-stream …


Integration Of Maintenance Into Design And Sustainability Of Buildings, Dinesh Reddy Patlolla Aug 2015

Integration Of Maintenance Into Design And Sustainability Of Buildings, Dinesh Reddy Patlolla

Masters Theses

Custodial maintenance is an important aspect of operational maintenance in a facility. Custodial maintenance improves an organization's discipline, performance and keeps surroundings healthy. That being said maintaining clean surroundings involves considerable cost. Custodial maintenance cost forms significant portion of building budgets, however these costs are often neglected. This research deals with the identification of variables that affect maintenance costs in a facility and reduction of maintenance costs. The minimization of cost is done by giving the administrator or facilities manager the option of selecting alternatives in frequency of maintenance, level of maintenance and the number of people required to complete …


An Experimental Approach For Developing Rfid Ready Receiving And Shipping, Amoldeep Singh Jaggi Aug 2011

An Experimental Approach For Developing Rfid Ready Receiving And Shipping, Amoldeep Singh Jaggi

Masters Theses

Abstract:

Radio Frequency Identification (RFID) and related technologies have been touted to allow exponential improvements in supply chain logistics and management. However, many industrial users have indicated that these technologies have not provided the anticipated benefits. The two complimentary strategies required to address the RFID reliability are: to improve the reliability of RFID technology and to design the supply chain infrastructure that enables RFID. The focus of this paper is on designing the supply chain infrastructure to enable RFID by developing guidelines for “RFID Ready Facilities”. These guidelines were developed based on a set of experiments conducted in the RFID …


Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu May 2011

Interaction Between Primary Resources And Root Causes In Lean Production Systems, Ernest Anene Iwuchukwu

Masters Theses

A model to analyze lean systems reliability is developed based on the premises that lean production systems require four primary resources; materials, equipment, personnel, and schedule (Sawhney, R., Subburaman, K., Sonntag, C., Capizzi, C. and Rao, P.V., 2009). The four primary lean resources were independently analyzed, without due consideration to underlying relationships within each other. In this research, relationships and interaction between root-causes and lean primary resources were conceptualized and developed. The development applied a five-phase approach: 1. review of related literature, 2. decompositions of lean primary resources, 3. selection of consensus root causes items and questionnaire construct, 4. survey …


Analyzing Supercomputer Utilization Under Queuing With A Priority Formula And A Strict Backfill Policy, Michael David Vanderlan May 2011

Analyzing Supercomputer Utilization Under Queuing With A Priority Formula And A Strict Backfill Policy, Michael David Vanderlan

Masters Theses

Supercomputers have become increasingly important in recent years due to the growing amount of data available and the increasing demand for quicker results in the scientific community. Since supercomputers carry a high cost to build and maintain, efficiency becomes more important to the owners, administrators, and users of these supercomputers. One important factor in determining the efficiency of a supercomputer is the scheduling of jobs that are submitted by users of the system. Previous work has dealt with optimizing the schedule on the system’s end while the users are blinded from the process. The work presented in this thesis investigates …