Open Access. Powered by Scholars. Published by Universities.®
![Digital Commons Network](http://assets.bepress.com/20200205/img/dcn/DCsunburst.png)
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Keyword
Articles 1 - 2 of 2
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Ambulatory Healthcare Utilization In The United States: A System Dynamics Approach, Rafael Diaz, Joshua G. Behr, Mandar Tulpule
Ambulatory Healthcare Utilization In The United States: A System Dynamics Approach, Rafael Diaz, Joshua G. Behr, Mandar Tulpule
VMASC Publications
Ambulatory health care needs within the United States are served by a wide range of hospitals, clinics, and private practices. The Emergency Department (ED) functions as an important point of supply for ambulatory healthcare services. Growth in our aging populations as well as changes stemming from broader healthcare reform are expected to continue trend in congestion and increasing demand for ED services. While congestion is, in part, a manifestation of unmatched demand, the state of the alignment between the demand for, and supply of, emergency department services affects quality of care and profitability. The central focus of this research is …
Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak
Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak
Finance Faculty Publications
This article describes the Delayed Bang Approach for determining the value of risk management alternatives in critical infrastructure security. The discussion includes (1) the need for sustainable risk management (2) the importance of time valuation in evaluating competing loss prevention and loss reduction alternatives, (3) the convergence of deterministic engineering economics, survivability analysis, and probabilistic analysis, and (4) hypothetical examples of the Delayed-Bang Approach and significance towards more sustainable risk management.