Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Other Operations Research, Systems Engineering and Industrial Engineering

2001

Overhead costs

Articles 1 - 1 of 1

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

A Case Study Analysis Of The Overhead Rate Impact Model Used During The C-5 Maintenance Source Selection, William N. Ward Mar 2001

A Case Study Analysis Of The Overhead Rate Impact Model Used During The C-5 Maintenance Source Selection, William N. Ward

Theses and Dissertations

The Overhead Rate Impact (ORI) model was used during the C-5 Maintenance source selection to evaluate the impact the new workload would have on the existing overhead rates. The objectives of this research study were to evaluate the ORI model and to identify the lessons learned from this source selection. To accomplish these objectives, interviews were conducted with members of the source selection team who were on the Cost Integrated Product Team (IPT). The experts were asked to identify the strengths and weaknesses of the ORI model and to make recommendation on how to improve the model. This study identified …