Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 2 of 2
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Inspection Process Flow Development For A Warehouse, Pahalawaththage Perera
Inspection Process Flow Development For A Warehouse, Pahalawaththage Perera
All Graduate Theses, Dissertations, and Other Capstone Projects
The project is based on a medical device outsourcing company in the US. In 2018 the company added a 44,000 sq ft new warehouse. With the scales of growth and market competition, it has come to a need to optimize production capacity to achieve 98% monthly on time delivery target. Optimizing production capacity comes with efficiently managing operations that impact overall product lead time. A primary factor that impacts the overall product lead time is production preparation time. Production preparation time is impacted by lead times of 3 operations managed by the new warehouse - Receiving Inspection, Incoming Inspection, and …
Process Improvement By Lean Thinking In Trucking Industry, Abhiram Reddy Ramasahayam
Process Improvement By Lean Thinking In Trucking Industry, Abhiram Reddy Ramasahayam
All Graduate Theses, Dissertations, and Other Capstone Projects
Manufacturing industries with complex production systems are struggling with designing optimal process to increase throughput. Companies will require high amount of labor and process improvement resources to sustain growth and delivery quality products to its customers. A chain of value added activities when designed and deployed with help of lean based methodologies can create high efficiency process. In this paper we have studies and implemented value added process based on the lean manufacturing methodologies which was adapted on the shop floor.
In many traditional truck body production industries have facing many problems like low production rate, big lead times, material …