Open Access. Powered by Scholars. Published by Universities.®
Operations Research, Systems Engineering and Industrial Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
Artificial Variable;Capacitated Lot Sizing;Dantzig-Wolfe decomposition;Emission control;Multi-level capacitated lot-sizing
Articles 1 - 1 of 1
Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering
Improvement To An Existing Multi-Level Capacitated Lot Sizing Problem With Setup Carryover, Backlogging, And Emission Control, Rifat Bin Hasan
Improvement To An Existing Multi-Level Capacitated Lot Sizing Problem With Setup Carryover, Backlogging, And Emission Control, Rifat Bin Hasan
Electronic Theses and Dissertations
This paper presents a multi-level, multi-item, multi-period capacitated lot-sizing problem. The lot-sizing problem studies can obtain production quantities, setup decisions, and inventory levels in each period fulfilling the demand requirements with limited capacity resources, considering the Bill of Material (B.O.M.) structure while simultaneously minimizing the production, inventory, and machine setup costs. The paper proposes an exact solution to Chowdhury et al. (2018)'s[1] developed model, which considers the backlogging cost, setup carryover & greenhouse gas emission control to its model complexity. The problem contemplates the Dantzig-Wolfe (D.W.) decomposition to decompose the multi-level capacitated problem into a single-item uncapacitated lot-sizing sub-problem. To …