Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 6 of 6

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan Apr 2011

Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan

Engineering Management & Systems Engineering Theses & Dissertations

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for fighter aircrafts (jobs) on multiple tankers (machines) to minimize the total weighted tardiness. ARSP can be modeled as a parallel machine scheduling with release times and due date-to-deadline window. ARSP assumes that the jobs have different release times, due dates, and due date-to-deadline windows between the refueling due date and a deadline to return without refueling. The Aerial Refueling Rescheduling Problem (ARRP), on the other hand, can be defined as updating the existing AR schedule after being disrupted by job related events including the …


Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez Apr 2011

Random Keys Genetic Algorithms Scheduling And Rescheduling Systems For Common Production Systems, Elkin Rodriguez-Velasquez

Engineering Management & Systems Engineering Theses & Dissertations

The majority of scheduling research deals with problems in specific production environments with specific objective functions. However, in many cases, more than one problem type and/or objective function exists, resulting in the need for a more generic and flexible system to generate schedules. Furthermore, most of the published scheduling research focuses on creating an optimal or near optimal initial schedule during the planning phase. However, after production processes start, circumstances like machine breakdowns, urgent jobs, and other unplanned events may render the schedule suboptimal, obsolete or even infeasible resulting in a "rescheduling" problem, which is typically also addressed for a …


A Structured Project-Risk Management And Life Cycle Framework For Complex Systems: Ship Repair And Maintenance (Sr&M) Projects, Michael Craig Plumb Apr 2011

A Structured Project-Risk Management And Life Cycle Framework For Complex Systems: Ship Repair And Maintenance (Sr&M) Projects, Michael Craig Plumb

Engineering Management & Systems Engineering Theses & Dissertations

This dissertation contributes to insights regarding the implications of using Project Risk Management (PRM) and Life Cycle Assessment (LCA) in managing projects for a complex system. The PRM approach apprehends many forms of risk both internal and external within a given project and assists the manager in determining the level of importance of each individual project phase and component to optimize project success. The life cycle approach to project management is used with short-term limitations with respect to a product's life cycle over several years. The literature discusses many tools and techniques that assist project managers in implementing optimal solutions, …


Evaluation System Design And Academic Performance Analysis Using Clustering And Simulation, Volkan Cakir Apr 2011

Evaluation System Design And Academic Performance Analysis Using Clustering And Simulation, Volkan Cakir

Engineering Management & Systems Engineering Theses & Dissertations

The starting point of this study was to understand the possible causes of evaluation system change in a military academic environment. With that motivation the objectives of this study were defined as examining student profiles in a military academy, establishing the nature of academic performance, comparing student groups that were identified by course scores, analyzing student performance changes over time and developing a manageable evaluation system and curriculum by comparing different scenarios.

An analysis was performed on the literature on academic performance prediction, cluster analysis methodologies and their development, and specifically summarized cluster analytic academic performance studies where these two …


Exploring The Effects Of Cooperative Adaptive Cruise Control In Mitigating Traffic Congestion, Georges M. Arnaout Apr 2011

Exploring The Effects Of Cooperative Adaptive Cruise Control In Mitigating Traffic Congestion, Georges M. Arnaout

Engineering Management & Systems Engineering Theses & Dissertations

The aim of this research is to examine the impact of CACC (Cooperative Adaptive Cruise Control) equipped vehicles on traffic-flow characteristics of a multilane highway system. The research identifies how CACC vehicles affect the dynamics of traffic flow on a road network and demonstrates the potential benefits of reducing traffic congestion due to stop-and-go traffic conditions. An agent-based traffic simulation model is developed specifically to examine the effect of these intelligent vehicles on the traffic flow dynamics. Traffic performance metrics characterizing the evolution of traffic congestion throughout the road network, are analyzed. Different CACC penetration levels are studied.

The positive …


Perspectives On Quality Coordination And Assurance In Global Supply Chains, Ling Li, John N. Warfield Jan 2011

Perspectives On Quality Coordination And Assurance In Global Supply Chains, Ling Li, John N. Warfield

Information Technology & Decision Sciences Faculty Publications

The 2007 recall of Berko Electric Toe-Space Heaters made in the US, the recall of backpack blowers made in Japan, the recalls of toys and pet food produced in China have exposed the potential of global supply chain disruptions. This product recall storm leads to the issue of quality assurance in global supply chain management. Product recalls indicate that manufacturing companies are particularly vulnerable to ensure quality when they source via a global supply chain with poor visibility. Obviously, a supply chain cannot afford this kind of sourcing and supply structure that threatens the supply-chain integrity. This special issue on …