Sae Formula Team Carbon Fiber Seat, Jacob Jaksic
Sae Formula Team Carbon Fiber Seat, Jacob Jaksic
Williams Honors College, Honors Research Projects
roject is for the Formula SAE Zips Racing team here at the University of Akron. The team includes Jacob Jaksic, Sean Turner, Dovydas Sodys, Mike White, and Sevin Johnson. We are tasked with reducing the weight of their current seat, while remaining comfortable to the driver. Our plan was to do this with a lightweight material, specifically carbon fiber. Many different steps were required when outlining this project: finalizing a design with verification from our Zips racing advisor, completing FEA analysis on finished design, acquiring material to be molded into seat, and finding a company to fabricate out of carbon …
Sae Formula Team Carbon Fiber Seat, Sean Turner, Jacob Jaksic
Sae Formula Team Carbon Fiber Seat, Sean Turner, Jacob Jaksic
Williams Honors College, Honors Research Projects
This project is for the Formula SAE Zips Racing team here at the University of Akron. The team includes Jacob Jaksic, Sean Turner, Dovydas Sodys, Mike White, and Sevin Johnson. We are tasked with reducing the weight of their current seat, while remaining comfortable to the driver. Our plan was to do this with a lightweight material, specifically carbon fiber. Many different steps were required when outlining this project: finalizing a design with verification from our Zips racing advisor, completing FEA analysis on finished design, acquiring material to be molded into seat, and finding a company to fabricate out of …
Implementation Of An Autonomous Guided Vehicle (Agv), Allen St. Myers, Alan Miller
Implementation Of An Autonomous Guided Vehicle (Agv), Allen St. Myers, Alan Miller
Williams Honors College, Honors Research Projects
This report thoroughly represents a proposal to AAM Metal Forming Minerva for the implementation of an AGV (Autonomous Guided Vehicle) Unit. Our recommendations are made with consideration to existing manufacturing processes and demonstrate how using an AGV would be a net positive investment for the company. By first examining the current operating costs, a three-tiered proposal is tailored based on increasing investment cost. Each tier increase encompasses the previous tiers’ proposed improvements while also growing in complexity and investment cost. The results of our research indicate that our Tier 2 proposal will provide the most benefit to our facility now …