Green Scheduling For Radiant Systems In Buildings, Truong X. Nghiem, Madhur Behl, George J. Pappas, Rahul Mangharam Oct 2012

Green Scheduling For Radiant Systems In Buildings, Truong X. Nghiem, Madhur Behl, George J. Pappas, Rahul Mangharam

Madhur Behl

In this report we look at the problem of peak power reduction for buildings with electric radiant floor heating systems. Uncoordinated operation of a multi-zone radiant floor heating system can result in temporally correlated electricity demand surges or peaks in the building’s electricity consumption. As peak power prices are 200-400 times that of the nominal rate, this uncoordinated activity can result in high electricity costs and expensive system operation. We have previously presented green scheduling as an approach for reducing the aggregate peak power consumption in buildings while ensuring that indoor thermal comfort is always maintained. This report extends the …


Green Scheduling For Radiant Systems In Buildings, Truong Nghiem, Madhur Behl, George Pappas, Rahul Mangharam Oct 2012

Green Scheduling For Radiant Systems In Buildings, Truong Nghiem, Madhur Behl, George Pappas, Rahul Mangharam

Rahul Mangharam

In this report we look at the problem of peak power reduction for buildings with electric radiant floor heating systems. Uncoordinated operation of a multi-zone radiant floor heating system can result in temporally correlated electricity demand surges or peaks in the building’s electricity consumption. As peak power prices are 200-400 times that of the nominal rate, this uncoordinated activity can result in high electricity costs and expensive system operation. We have previously presented green scheduling as an approach for reducing the aggregate peak power consumption in buildings while ensuring that indoor thermal comfort is always maintained. This report extends the …


Switch Yard Operation In Thermal Power Plant(Katpp Jhalawar Rajasthan), Radhey Shyam Meena Er. Jul 2012

Switch Yard Operation In Thermal Power Plant(Katpp Jhalawar Rajasthan), Radhey Shyam Meena Er.

Radhey Shyam Meena

Switchyard Provides the facilities for switching ,protection & Control of electric power. To handle high Voltage power with proper Safety measures. To isolate the noises coming from the grid with true 50Hz power SWITCH YARD IS IMPORTANT PART IN THERMAL PLANT. IN KALISINDH THERMAL 400KV AND 220KV SWITCH YARD LOCATED.


Experimental Verification Of The Linear Relationship Between Stress And The Reciprocal Of The Peak Barkhausen Voltage In Astm A36 Steel, Orfeas Kypris, Ikenna Nlebedim, David Jiles Jan 2012

Experimental Verification Of The Linear Relationship Between Stress And The Reciprocal Of The Peak Barkhausen Voltage In Astm A36 Steel, Orfeas Kypris, Ikenna Nlebedim, David Jiles

Orfeas Kypris

This study presents an experimental validation of a model theory for determining the relationship between a nondestructive measurement parameter and a property of interest. It was found that the reciprocal of the peak envelope amplitude of the Barkhausen emission voltage follows a linear relationship with stress. A linear relationship between stress and the reciprocal of the root mean square voltage was also obtained. These observations represent an important step towards improving the use of Barkhausen signals for magnetic non-destructive evaluation of stress as a function of depth in ferromagnetic load bearing structures.


Adaptive Kriging Controller Design For Hypersonic Flight Vehicle Via Back-Stepping, Bin Xu Jan 2012

Adaptive Kriging Controller Design For Hypersonic Flight Vehicle Via Back-Stepping, Bin Xu

Bin Xu

No abstract provided.


Direct Neural Discrete Control Of Hypersonic Flight Vehicle, Bin Xu Jan 2012

Direct Neural Discrete Control Of Hypersonic Flight Vehicle, Bin Xu

Bin Xu

No abstract provided.