Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

2019

Mechanical Engineering

University of Texas Rio Grande Valley

Articles 1 - 2 of 2

Full-Text Articles in Civil and Environmental Engineering

An Advanced Approach For Contract Time Determination In Highway Projects, Cuauhtemoc Torres Cantu Dec 2019

An Advanced Approach For Contract Time Determination In Highway Projects, Cuauhtemoc Torres Cantu

Theses and Dissertations

In project management, finishing a project on schedule is one of the most important aspects. The Texas Department of Transportation (TxDOT) has been experiencing delays in some projects that can be accounted to an inaccurate project time estimation process. This research presents the development of a user-friendly and comprehensive computer-based contract time determination system. The enhanced system implements probabilistic scheduling techniques such as Program Evaluation and Review Technique, and Monte Carlo Simulation. Additionally, the application of a lognormal two-point PERT method is explored in this study. The new system proposes the use of a database of production rates based on …


Assessment Of Some Of The Common Practices Used In Scheduling Highway Projects, Jennifer Reyes Aug 2019

Assessment Of Some Of The Common Practices Used In Scheduling Highway Projects, Jennifer Reyes

Theses and Dissertations

There are several factors documented in the literature that can affect the accuracy of estimated project durations in highway construction, such as weather, location, and soil conditions. Recently, the Texas Department of Transportation (TxDOT) raised a concern regarding some of the practices used when estimating the contract time for projects. This research presents an assessment of the effect that two practices identified have on the estimated project duration. These two practices include: 1) the estimated lead/lag times in project schedules and 2) scheduling with only critical or controlling activities. The effect of these practices is measured, primarily, by using four …