Repair Of I-65 Expressway Bridges Using Carbon Fiber Reinforced Polymer (Cfrp) Composites, Ching Chiaw Choo, Abheetha Peiris, Issam E. Harik Aug 2015

Repair Of I-65 Expressway Bridges Using Carbon Fiber Reinforced Polymer (Cfrp) Composites, Ching Chiaw Choo, Abheetha Peiris, Issam E. Harik

Issam E. Harik

This report documents the repair of five locations along the I-65 Expressway in Jefferson County, KY. The repair involved: (1) the precast prestressed concrete girder spans between Jacob Street and Gray Street, (2) the reinforced concrete bearing pads of Bridge Pier 4 at the intersection of Jefferson Street and Preston Street, (3) the reinforced concrete bearing pads of Bridge Pier 6 near the intersection of Main Street and Hancock Street, (4) the precast prestressed concrete girder spans between Chestnut Street and Gray Street and (5) the reinforced concrete pier column on East Muhammad Ali Blvd.

The precast prestressed concrete girders …


Shear Repair Of P/C Box Beams Using Carbon Fiber Reinforced Polymer (Cfrp) Fabric, Jim Simpson, Issam Harik, Choo Chiaw Aug 2015

Shear Repair Of P/C Box Beams Using Carbon Fiber Reinforced Polymer (Cfrp) Fabric, Jim Simpson, Issam Harik, Choo Chiaw

Issam E. Harik

The report documents the retrofit work carried out on the KY3297 Bridge over Little Sandy River in Carter County, Kentucky. Field investigation and evaluation revealed that the bridge superstructure was deficient in shear. The repair work was carried out using externally bonded carbon fiber reinforced polymer (CFRP) fabric system. The repair, using externally bonded fiber system, offers the following benefits: (1) the use of light construction equipment, hand kits and tools, (2) minimal traffic disruption as all lanes were open to traffic while work was being performed underneath the bridge, and (3) cost saving; the cost for the repair and …