Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Civil and Environmental Engineering

Water Productivity In Meat And Milk Production In The Us From 1960 To 2016, Mesfin Mekonnen, C.M.U. Neale, Chittaranjan Ray, Galen E. Erickson, Arjen Y. Hoekstra Aug 2019

Water Productivity In Meat And Milk Production In The Us From 1960 To 2016, Mesfin Mekonnen, C.M.U. Neale, Chittaranjan Ray, Galen E. Erickson, Arjen Y. Hoekstra

Daugherty Water for Food Global Institute: Faculty Publications

Global demand for livestock products is rising, resulting in a growing demand for feed and potentially burdening freshwater resources to produce this feed. To offset this increased pressure on water resources, the environmental performance of livestock sector should continue to improve. Over the last few decades, product output per animal and feedstuff yields in the US have improved, but before now it was unclear to what extent these improvements influenced the water productivity (WP) of the livestock products. In this research, we estimate changes in WP of animal products from 1960 to 2016. We consider feed conversion ratios (dry matter …


Statistical Viability Analysis Of United States Air Force Estimating Cost Factor For Sustainable Construction, Philip A. Ramsey, Diedrich Prigge, Torrey J. Wagner, Alfred E. Thal Jr. May 2019

Statistical Viability Analysis Of United States Air Force Estimating Cost Factor For Sustainable Construction, Philip A. Ramsey, Diedrich Prigge, Torrey J. Wagner, Alfred E. Thal Jr.

Faculty Publications

Varying legislation and executive orders coupled with needs for energy resiliency have led the United States Air Force (USAF) to pursue sustainable construction. However, the limited understanding of initial costs to implement these changes have contributed to poor project cost estimating, resulting in 62 percent of USAF projects experiencing more than 5 percent cost growth. After reviewing 1628 USAF Military Construction (MILCON) construction projects in 922 category codes (CATCODEs), a twotailed t-test for populations with unequal variance was accomplished on the final normalized contract cost for 340 projects in 16 CATCODEs executed between 2002 and 2017. This analysis provides a …