Open Access. Powered by Scholars. Published by Universities.®
Civil and Environmental Engineering Commons™
Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- AROMA-VOC (1)
- Ballast (1)
- Construction (1)
- Construction Safety (1)
- Crosstie (1)
-
- Evapotranspiration (1)
- FAIR principle (1)
- Forecast accuracy (1)
- Hydrograph (1)
- Industry Professionals (1)
- Information Gap (1)
- Institutional Learning (1)
- Landslide (1)
- Mapping tool (1)
- Near-Miss (1)
- PFAS (1)
- Pedestrian and Bicycle Projects (1)
- Pipe fittings (1)
- Policy and Procedures (1)
- Project Prioritization (1)
- Quantile regression (1)
- Railroad (1)
- Reference class forecasting (1)
- Regenerative design (1)
- Reporting (1)
- Spatial approach (1)
- Square wave theory (1)
- Stakeholder engagement (1)
- Statistical approach (1)
- Stormflow (1)
Articles 1 - 9 of 9
Full-Text Articles in Civil and Environmental Engineering
Development Of A Decision-Making Tool For Prediction Of Rainfall-Induced Landslides, Faisal Shakib Ahmed
Development Of A Decision-Making Tool For Prediction Of Rainfall-Induced Landslides, Faisal Shakib Ahmed
Theses and Dissertations--Civil Engineering
Landslides are frequently observed in mountainous places following prolonged periods of rain, frequently resulting in substantial topography changes. They pose a significant risk to human lives and the built environment globally, particularly in areas prone to excessive rainfall. While slope failures can occur because of human-caused factors such as slope loading or toe cutting for construction purposes, many failures occur because of rainfall penetrating an otherwise stable slope. A greater understanding of the characteristics and mechanics of landslides is consequently critical for geotechnical research, particularly in evaluating prospective mitigation strategies. The potential of slope failure is a primary consideration when …
Accuracy And Uncertainty In Traffic And Transit Ridership Forecasts, Jawad Mahmud Hoque
Accuracy And Uncertainty In Traffic And Transit Ridership Forecasts, Jawad Mahmud Hoque
Theses and Dissertations--Civil Engineering
Investments of public dollars on highway and transit infrastructure are influenced by the anticipated demands for highways and public transportations or traffic and transit ridership forecasts. The purpose of this study is to understand the accuracy of road traffic forecasts and transit ridership forecasts, to identify the factors that affect their accuracy, and to develop a method to estimate the uncertainty inherent in those forecasts. In addition, this research investigates the pre-pandemic decline in transit ridership across the US metro areas since 2012 and its influence on the accuracy of transit forecasts.
The sample of 1,291 road projects from the …
Sewer Vapor Intrusion Pathway: Simulation Of Indoor Piping Systems And Operation Of Aroma-Voc Gas Analyzer, Hong Cheng Tay
Sewer Vapor Intrusion Pathway: Simulation Of Indoor Piping Systems And Operation Of Aroma-Voc Gas Analyzer, Hong Cheng Tay
Theses and Dissertations--Civil Engineering
Vapor Intrusion (VI) is a transport phenomenon that occurs when contaminants migrate from sub-surface sources into indoor spaces. Sewer tunnels, plumbing connections, and piping infrastructures can be important contributors to an increased potential of VI in a site, which results in indoor concentrations of volatile organic compounds (VOC). In the present work, the topic of sewer VI pathways were investigated through a prototype made from various types of indoor plumbing pipe fittings. This prototype simulates indoor piping systems and determine whether air and VOC were escaping through the pipe fittings. Moreover, this study is the first effort to use a …
Identifying And Evaluating The Perceptions Of Near-Miss Reporting Within The Kentucky Transportation Cabinet, Seth Atkins
Identifying And Evaluating The Perceptions Of Near-Miss Reporting Within The Kentucky Transportation Cabinet, Seth Atkins
Theses and Dissertations--Civil Engineering
In the field of construction, most safety data and practices focus on preventing and mitigating serious incidents resulting in injuries or fatalities. However, on construction sites, near-miss events occur more frequently than said serious incidents and, under marginally different conditions, could potentially lead to damages, injuries, or fatalities. Therefore, near-miss reporting can serve as a useful tool for managing safety as it allows for workers to identify and managers to address potential risk factors within construction sites. While most construction companies have implemented some method for reporting near-miss events, many organizations, such as the Kentucky Transportation Cabinet (KYTC), struggle with …
Investigation Of Pfas Exposure Risks In Kentucky Using Mapping Tools, Sweta Ojha
Investigation Of Pfas Exposure Risks In Kentucky Using Mapping Tools, Sweta Ojha
Theses and Dissertations--Civil Engineering
Per- and polyfluoroalkyl substances (PFAS), a group of environmentally-persistent compounds, are environmentally ubiquitous and challenging to remediate. Several studies show that PFAS are detected in drinking water systems when sampling is conducted, making human exposure via drinking water an important health consideration. This research: 1) develops a mapping tool for prioritizing sampling locations; 2) establishes a method for making GIS data and meta(data) in the mapping tool accessible; 3) fosters decision making by integrating knowledge brokering and the alignment interest and influence matrix (AIIM). The tool developed is this research is a geospatial and statistical PFAS hot-spot screening model that …
Understanding The Differences Between Industry Objectives And Institutional Learning, Kristen Schell
Understanding The Differences Between Industry Objectives And Institutional Learning, Kristen Schell
Theses and Dissertations--Civil Engineering
To combat understaffing in the construction industry, it is necessary to employ the best candidates possible. By identifying the most desirable skills in a construction employee from an industry perspective, institutional learning can better prepare graduates for the construction workforce. Currently there exists an information gap in the objectives of the construction industry and institutional learning. This gap produces graduates, professors, and employers with expectations that do not align. Reducing this gap will aid in the success of hiring recently graduated construction students who can meet the ever-changing demands of the industry. Construction students who are fresh out of college …
Evaluation Of Scoring Methods For Prioritizing Pedestrian And Bicycle Projects, Daria Korostina
Evaluation Of Scoring Methods For Prioritizing Pedestrian And Bicycle Projects, Daria Korostina
Theses and Dissertations--Civil Engineering
To increase the number of pedestrian and bicycle facilities and to grow the number of people using those facilities in Kentucky more such projects need to be implemented. The Strategic Highway Investment Formula for Tomorrow (SHIFT) is a data-driven approach that Kentucky uses for prioritizing projects in the state, but its focus is auto-centric. The purpose of this study was to develop and evaluate a prioritization scoring approach for pedestrian and bicycle projects that could be implemented into SHIFT. The study used the SHIFT–2022 pedestrian and bicycle projects to develop and evaluate different scoring scenarios. After scoring each project on …
Using Stream Restoration To Mitigate Stormwater Runoff In An Urban Watershed: A Case Study, Jonathan M. Brantley
Using Stream Restoration To Mitigate Stormwater Runoff In An Urban Watershed: A Case Study, Jonathan M. Brantley
Theses and Dissertations--Biosystems and Agricultural Engineering
The goal of this case study was to evaluate the effectiveness a 275 m regenerative stream restoration design to mitigate stormwater runoff in a highly urbanized watershed. The restoration resulted in a wide, wetland-like floodplain, comprised of a rock base that was overtopped with a filtration media (approximately 30% woodchips and 70% topsoil). The creation of the floodplain-wetland complex in tandem with filtration media lead to increased storage capacity and an increase in hyporheic exchange within the system. Significant reductions were found for the storm hydrograph parameters volume, peak discharge, and time to peak. Reductions in baseflows were also noted …
Load And Pressure Distribution As A Function Of Dynamic Contact Stress At The Railroad Crosstie-Ballast Interface, Habib Abdil Unluoglu
Load And Pressure Distribution As A Function Of Dynamic Contact Stress At The Railroad Crosstie-Ballast Interface, Habib Abdil Unluoglu
Theses and Dissertations--Civil Engineering
Excessive crosstie wear and abrasion and ballast wear and fouling are two of the fundamental problems contributing to inadequate railroad track performance. This adversely affects the attainment and long-term maintenance of desired track geometric requirements. The magnitudes and distribution of the stresses at the crosstie-ballast (CT-B) interface must be known to determine the stress distribution on the ballast. However, the stresses at the top of the ballast often vary significantly. This study examines a new approach to predicting dynamic contact pressures at the interface of crosstie and ballast using the ‘square wave theory.’ A data set of in-track CT-B interfacial …