Open Access. Powered by Scholars. Published by Universities.®

Chemical Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Chemical Engineering

Combined Risk Based Inspection And Fault Tree Analysis For Repetitive 3-Phase Line Piping Leakage At West Java Offshore Topside Facility, Dona Yuliati, Akhmad Herman Yuwono, Datu Rizal Asral, Donanta Dhaneswara Dec 2023

Combined Risk Based Inspection And Fault Tree Analysis For Repetitive 3-Phase Line Piping Leakage At West Java Offshore Topside Facility, Dona Yuliati, Akhmad Herman Yuwono, Datu Rizal Asral, Donanta Dhaneswara

Journal of Materials Exploration and Findings

Hydrocarbon releases might result in serious consequences in various aspects. In addition to the contribution to environmental pollution, repetitive leakages need high repair costs. This study aim is to minimize potential repetitive leakage for other typical 3-phase piping systems. We conducted the risk assessment by adopting Risk Based Inspection (RBI) API 581 to identify risk level, calculating piping lifetime, recommended inspection plan and mitigations. The most relevant root causes can be obtained through quantitative Fault Tree Analysis (FTA). Observation and investigation was taken from eight 3-phase piping systems that experienced repetitive leakages. It has been found that the risk level …


Maintenance Activity Planning By Reability Centered Maintenance Ii Method, Rachmad Hidayat, Nachnul Ansori, Ali Imron Apr 2010

Maintenance Activity Planning By Reability Centered Maintenance Ii Method, Rachmad Hidayat, Nachnul Ansori, Ali Imron

Makara Journal of Technology

Maintenance Activity Planning by Reability Centered Maintenance II Method. This research discusses maintenance activity planning using the RCM II method to evaluate failure function risk on compresor screw. The calculation of maintenance time is performed by considering maintenance and repair costs. The risk evaluation result with RPN shows that the critical component that needs to get the main priority in applying maintenance on compresor screw is function disorder on timeworn piston and on the broken outgoing air sponge’s filter that receives RPN 45. The optimum maintenance time calculation is applied on components that undergo scheduled restoration and scheduled discard task …