Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- Trade-off Balancing (3)
- Operating Room Scheduling (2)
- Boundary Element Method (1)
- Constructive Heuristic (1)
- Continuous Improvement (1)
-
- Decision-making (1)
- Dissipative Silencer (1)
- Flowtime (1)
- Heuristics (1)
- Heuristics. (1)
- Key performance indicators (1)
- Lean systems (1)
- Lined Duct (1)
- Logistic Regression (1)
- Makespan (1)
- Makespan and Total Completion Time (1)
- Modern portfolio theory (1)
- No-wait Flow Shop (1)
- Parallel-Baffle Silencer (1)
- Permutation Flow Shop (1)
- Problem Solving (1)
- Risk Impact Analysis (1)
- Risk Likelihood Analysis (1)
- Statistical process control (1)
- Sustainable Product Design (1)
- Toyota Production System (1)
- Transmission Loss (1)
Articles 1 - 6 of 6
Full-Text Articles in Engineering
Quantitative Methods For Total Lifecycle Risk Likelihood And Impact Assessment In Sustainable Product Design Decision Making, Christian Enyoghasi
Quantitative Methods For Total Lifecycle Risk Likelihood And Impact Assessment In Sustainable Product Design Decision Making, Christian Enyoghasi
Theses and Dissertations--Mechanical Engineering
Sustainable products promise significant economic, environmental, and societal benefits. Numerous methods are available for use during the new product development process to identify alternate product designs that optimize sustainability performance. Once any such design is selected and the product is launched, many uncertainties are likely to affect its performance over the total lifecycle. Such uncertainties give rise to risks that can influence the overall product sustainability performance. However, comprehensive quantitative methods to evaluate the likelihood or the impact of different risks to enable sustainable product design decision making are lacking.
This research aims to address this gap by developing a …
Balancing Trade-Offs In One-Stage Production With Processing Time Uncertainty, Jingjing You
Balancing Trade-Offs In One-Stage Production With Processing Time Uncertainty, Jingjing You
Theses and Dissertations--Mechanical Engineering
Stochastic production scheduling faces three challenges, first the inconsistencies among key performance indicators (KPIs), second the trade-offs between the expected return and the risk for a portfolio of KPIs, and third the uncertainty in processing times. Based on two inconsistent KPIs of total completion time (TCT) and variance of completion times (VCT), we propose our trade-off balancing (ToB) heuristic for one-stage production scheduling. Through comprehensive case studies, we show that our ToB heuristic with preference =0.0:0.1:1.0 efficiently and effectively addresses the three challenges. Moreover, our trade-off balancing scheme can be generalized to balance a number of …
Regression Analysis Of Factors Impacting Problem Solving Engagement Within Lean Systems Implementation, David M. Parsley Ii
Regression Analysis Of Factors Impacting Problem Solving Engagement Within Lean Systems Implementation, David M. Parsley Ii
Theses and Dissertations--Mechanical Engineering
Organizations around the world have attempted to implement the concepts of the Toyota Production System (TPS), commonly referred to as Lean, with limited sustainable success. The central principles of TPS, continuous improvement and respect for people, are grounded in the Japanese values of Monozukuri and Hitozukuri. Monozukuri deals with creating or making a product, while Hitozukuri conveys the idea of developing people through learning. In order for organizations to adopt these values they must have a system that engages employees at all levels in applying problem solving to improve their work. This research uses organizational assessments obtained from a variety …
Adaptive Scheduling For Operating Room Management, Honghan Ye
Adaptive Scheduling For Operating Room Management, Honghan Ye
Theses and Dissertations--Mechanical Engineering
The perioperative process in hospitals can be modelled as a 3-stage no-wait flow shop. The utilization of OR units and the average waiting time of patients are related to makespan and total completion time, respectively. However, minimizations of makespan and total completion time are NP-hard and NP-complete. Consequently, achieving good effectiveness and efficiency is a challenge in no-wait flow shop scheduling. The average idle time (AIT) and current and future idle time (CFI) heuristics are proposed to minimize makespan and total completion time, respectively. To improve effectiveness, current idle times and future idle times are taken into consideration …
Analytical And Boundary Element Solutions Of Bulk Reacting Lined Ducts And Parallel-Baffle Silencers, Jundong Li
Analytical And Boundary Element Solutions Of Bulk Reacting Lined Ducts And Parallel-Baffle Silencers, Jundong Li
Theses and Dissertations--Mechanical Engineering
Lined silencers of various configurations are used to attenuate the noise from building HVAC equipment, gas turbines, and other machinery. First-mode analytical solutions are presented for sound attenuation along rectangular lined ducts, parallel-baffle silencers, and circular lined ducts. The sound absorptive lining is treated using a bulk property model. The analytical solutions entail solving a nonlinear characteristic equation in the transverse direction after the rigid-wall boundary condition is applied. The solution is compared to the boundary element solution and a local impedance analytical solution for several test cases.
An Efficient Heuristic To Balance Trade-Offs Between Utilization And Patient Flowtime In Operating Room Management, Feidi Dang
Theses and Dissertations--Mechanical Engineering
Balancing trade-offs between production cost and holding cost is critical for production and operations management. Utilization of an operating room affects production cost, which relates to makespan, and patient flowtime affects holding cost. There are trade-offs between two objectives, to minimize makespan and to minimize flowtime. However, most existing constructive heuristics focus only on single-objective optimization. In the current literature, NEH is the best constructive heuristic to minimize makespan, and LR heuristic is the best to minimize flowtime. In this thesis, we propose a current and future deviation (CFD) heuristic to balance trade-offs between makespan and flowtime minimizations. Based on …