Articles 1 - 3 of 3

Full-Text Articles in Engineering

United States Department Of Defense (Dod) Real Property Repair, Alterations, Maintenance, And Construction Project Contract Data: 2009–2020, Tyler Stout, Adam Teston, Brent T. Langhals, Justin D. Delorit, Carlton Hendrix, Steven J. Schuldt Oct 2020

United States Department Of Defense (Dod) Real Property Repair, Alterations, Maintenance, And Construction Project Contract Data: 2009–2020, Tyler Stout, Adam Teston, Brent T. Langhals, Justin D. Delorit, Carlton Hendrix, Steven J. Schuldt

Faculty Publications

Nearly one-half of all construction projects exceed planned costs and schedule, globally [1]. Owners and construction managers can analyze historical project performance data to inform cost and schedule overrun risk-reduction strategies. Though, the majority of open-source project datasets are limited by the number of projects, data dimensionality, and location. A significant global customer of the construction industry, the Department of Defense (DoD) maintains a vast database of historical project data that can be used to determine the sources and magnitude of construction schedule and cost overruns for many continental and international locations. The selection of data provided by the authors …


Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr. Apr 2020

Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr.

Faculty Publications

This study uses descriptive and inferential statistics to identify cost growth Analysis of Military Construction of military construction (MILCON) at the programmatic level, while bridging the gap between Selected Acquisition Report (SAR) estimates and actual project costs. Findings of this study aid the cost community with appropriate allocation of resources in developing these estimates. Overall, Major Defense Acquisition Programs (MDAP) appear to experience more negative growth (cost savings) in MILCON estimates on reviewed SARs— typically less than 0.2% of the total program cost. SAR estimates became more accurate from the first to last SAR in comparison to the total MILCON …


Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak Jan 2018

Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak

Faculty Publications

This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle for 36 Department of Defense aircraft programs. Starting from Milestone B, the authors examine CGFs at five gateways: Critical Design Review, First Flight (FF), the end of Developmental Test and Evaluation (DT&E), Initial Operational Capability, and Full Operational Capability. Each CGF is assigned a color rating based upon the program’s cost growth: Green (low), Amber (moderate), or Red (high). Significant findings include dependencies among similar CGF color ratings and cost growth occurring primarily between FF and the end of DT&E during a program’s life cycle.