Articles 1 - 5 of 5

Full-Text Articles in Engineering

United States Department Of Defense (Dod) Real Property Repair, Alterations, Maintenance, And Construction Project Contract Data: 2009–2020, Tyler Stout, Adam Teston, Brent T. Langhals, Justin D. Delorit, Carlton Hendrix, Steven J. Schuldt Oct 2020

United States Department Of Defense (Dod) Real Property Repair, Alterations, Maintenance, And Construction Project Contract Data: 2009–2020, Tyler Stout, Adam Teston, Brent T. Langhals, Justin D. Delorit, Carlton Hendrix, Steven J. Schuldt

Faculty Publications

Nearly one-half of all construction projects exceed planned costs and schedule, globally [1]. Owners and construction managers can analyze historical project performance data to inform cost and schedule overrun risk-reduction strategies. Though, the majority of open-source project datasets are limited by the number of projects, data dimensionality, and location. A significant global customer of the construction industry, the Department of Defense (DoD) maintains a vast database of historical project data that can be used to determine the sources and magnitude of construction schedule and cost overruns for many continental and international locations. The selection of data provided by the authors …


Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr. Apr 2020

Analysis Of Military Construction Cost Growth In Usaf Major Defense Acquisition Programs, Emily E. Angell, Edward D. White, Jonathan D. Ritschel, Alfred E. Thal Jr.

Faculty Publications

This study uses descriptive and inferential statistics to identify cost growth Analysis of Military Construction of military construction (MILCON) at the programmatic level, while bridging the gap between Selected Acquisition Report (SAR) estimates and actual project costs. Findings of this study aid the cost community with appropriate allocation of resources in developing these estimates. Overall, Major Defense Acquisition Programs (MDAP) appear to experience more negative growth (cost savings) in MILCON estimates on reviewed SARs— typically less than 0.2% of the total program cost. SAR estimates became more accurate from the first to last SAR in comparison to the total MILCON …


Analysis Of Military Construction Cost Growth In Major Defense Acquisition Programs, Emily E. Angell Mar 2019

Analysis Of Military Construction Cost Growth In Major Defense Acquisition Programs, Emily E. Angell

Theses and Dissertations

This study is an exploratory analysis combining military construction (MILCON) data from the Selected Acquisition Reports (SAR) of Major Defense Acquisition Programs (MDAP) with the associated Automated Civil Engineer System project actual costs. The analysis uses both descriptive and inferential statistics to identify cost growth of MILCON at the programmatic level as well as to bridge the gap between SAR estimates and actual project costs within those program-level estimates. Overall, programs experience more negative growth (cost savings) in MILCON estimates on SARs, typically less than 0.2% of the total program cost implying minimal impact to program decisions. Estimates got more …


An Analysis Of Major Acquisition Reforms Through Text Mining And Grounded Theory Design, Amanda L. Mcgowin Mar 2018

An Analysis Of Major Acquisition Reforms Through Text Mining And Grounded Theory Design, Amanda L. Mcgowin

Theses and Dissertations

Cost growth is an established phenomenon within Defense Acquisition that the US Government has attempted to abolish for decades through seemingly endless cycles of reform. Dozens of experts and senior leaders within the acquisition community have published their notions on the reasons for cost growth, nevertheless, legislation has yet to eradicate this presumed conundrum. For this reason, this research is aimed at identifying existing trends within past major Defense Acquisition Reform legislation, as well as in a compendium of views from leaders within the Defense Acquisition community on the efficacy of acquisition reform, to determine the possible disconnect. To accomplish …


Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak Jan 2018

Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak

Faculty Publications

This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle for 36 Department of Defense aircraft programs. Starting from Milestone B, the authors examine CGFs at five gateways: Critical Design Review, First Flight (FF), the end of Developmental Test and Evaluation (DT&E), Initial Operational Capability, and Full Operational Capability. Each CGF is assigned a color rating based upon the program’s cost growth: Green (low), Amber (moderate), or Red (high). Significant findings include dependencies among similar CGF color ratings and cost growth occurring primarily between FF and the end of DT&E during a program’s life cycle.