Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Mil-Std-188-125-1, High-Altitude Emp Protection For Fixed Ground-Based Facilities Mar 2005

Mil-Std-188-125-1, High-Altitude Emp Protection For Fixed Ground-Based Facilities

George H Baker

MIL-STD-188-125-1 establishes minimum requirements and design objectives for high-altitude electromagnetic pulse (HEMP) hardening of fixed ground-based facilities that perform critical, time-urgent command, control, communications, computer, and intelligence (C4I) missions. The standard prescribes minimum performance requirements for low-risk protection from mission-aborting damage or upset due to HEMP environments. It also addresses minimum testing requirements for demonstrating that prescribed performance has been achieved and for verifying that the installed protection subsystem provides the operationally required hardness for the completed facility. Covered fixed ground-based facility types include subscriber terminals and data processing centers, transmitting and receiving communications stations, and relay facilities. Use of …


Mil-Std-188-125-2, High-Altitude Emp Protection For Transportable Systems Mar 1999

Mil-Std-188-125-2, High-Altitude Emp Protection For Transportable Systems

George H Baker

This standard establishes minimum requirements and design objectives for high-altitude electromagnetic pulse (HEMP) hardening of transportable1 ground-based systems that perform critical, time-urgent command, control, communications, computer, and intelligence (C4I) missions. Systems required to fully comply with the provisions of the standard will be designated by the Joint Chiefs of Staff, a Military Department Headquarters, or a Major Command.

The standard prescribes minimum performance requirements for low-risk protection from mission-aborting damage or upset due to HEMP threat environments. The standard also addresses minimum testing requirements for demonstrating that prescribed performance has been achieved and for verifying that the installed protection measures …