Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

PDF

Purdue University

2007

Bridge

Articles 1 - 3 of 3

Full-Text Articles in Engineering

Bridge Lock-Up Device System, Purdue Ect Team Jan 2007

Bridge Lock-Up Device System, Purdue Ect Team

ECT Fact Sheets

The Colebrand Lock-up Device (LUD) provides additional substructure strength to resist seismic forces as a structural shock transmission unit for highway bridges. This system can provide a temporary rigid link between bridge structural members under seismic, braking, or other fast-acting type loads, while permitting slow thermal movements.


Fiber Optic Sensor : Monitoring Precast Beams, Purdue Ect Team Jan 2007

Fiber Optic Sensor : Monitoring Precast Beams, Purdue Ect Team

ECT Fact Sheets

A new bridge over the Rio Puerco river, west of Albuquerque will be the first of its kind in the nation with built-in fiber-optic sensors to monitor stress in the bridge's girders. Known as "smart bridge" technology, the self-monitoring system offers many advantages over methods that rely largely on visual inspections.


Long-Term Effects Of Super Heavy-Weight Vehicles On Bridges, Scott M. Wood, Necip Onder Akinci, Judy Liu, Mark D. Bowman Jan 2007

Long-Term Effects Of Super Heavy-Weight Vehicles On Bridges, Scott M. Wood, Necip Onder Akinci, Judy Liu, Mark D. Bowman

JTRP Technical Reports

A permit truck which exceeds the predefined limit of 108 kips is defined as a superload in Indiana. This study was conducted to examine the long-term effects of superload trucks on the performance of typical slab-on-girder bridges and to assess the likelihood of causing immediate damage. Typical steel and prestressed concrete slab-on-girder type bridges were analyzed using both beam line analysis and detailed finite element models. Furthermore, one prestressed concrete bridge and one steel bridge were instrumented using more than 50 sensors each. Strains and deflections were measured during a live load test, and each bridge was monitored for more …