Roaded Catchments To Improve Reliability Of Farm Dams, David Stanton Jun 2005

Roaded Catchments To Improve Reliability Of Farm Dams, David Stanton

Bulletins 4000 -

Maintaining reliable on-farm water supplies is an on-going challenge for landholders throughout Western Australia. Improving reliability of dams by constructing a roaded catchment is one of the most cost-effective methods of improving the performance and reliability of a farm water supply.

A roaded catchment is a water-harvesting structure designed to increase the amount of run-off from the catchment above a dam. The 'roads' of a roaded catchment are parallel ridges of earth with batters (or side slopes) that cause run-off to be directed into troughs or channels. The surface is lined with clay and compacted to make it smooth and …


Micro Hydro Power, Frederick J. Munster Jan 1999

Micro Hydro Power, Frederick J. Munster

Maine Collection

Micro Hydro Power

by Frederick J. Munster

Department of Economic and Community Development, August, Me. 1999 (?).

Contents: Introduction / History of Hydropower in Maine / Renewables / Why Micro Hydro / Determining Flow / Determining Head / Estimating Energy Potential / Hydro Turbines / Dams, Impoundments, Penstocks and Power Houses / Utility Interconnected Systems / Battery Charging Systems / Operation and Maintenance / Economics / Regulation of Hydro Development / For More Information / References


Practical Hints For The Layout And Construction Of 10,000 M3 Circular Dams, Terry Babbington, J S. Addison Jan 1999

Practical Hints For The Layout And Construction Of 10,000 M3 Circular Dams, Terry Babbington, J S. Addison

Bulletins 4000 -

These notes and illustrations have been compiled to assist earthmovers in the construction of circular excavated earth tank dams, with pipe inlets. Construction techniques tend to evolve over time, so the methods described in this publication will not be definitive, but, they may improve efficiency of construction in the interim. Although the example used in these notes refers to 10,000 m3 dams, the construction techniques, using a bulldozer, described here equally apply to dams of any volume of similar design. Only dimensions will vary. earthmovers using a scarper together with a bulldozer should be able to extract useful information from …


Feasibility Study Of Maine's Small Hydropower Potential, James D. Sysko Jan 1989

Feasibility Study Of Maine's Small Hydropower Potential, James D. Sysko

Maine Collection

Feasibility Study of Maine's Small Hydropower Potential

Prepared by James D. Sysko, Small Hydro East, for the Maine State Planning Office, Maine Office of Energy Resources, January 1989.

"This study focuses on finding potential hydropower sites of approximately 50 kw to 1000 kw in capacity."



Fundy Tidal Power Development : Preliminary Evaluation Of Its Environmental Consequences To The Resources Of The State Of Maine, Bigelow Laboratory For Ocean Sciences Apr 1984

Fundy Tidal Power Development : Preliminary Evaluation Of Its Environmental Consequences To The Resources Of The State Of Maine, Bigelow Laboratory For Ocean Sciences

Maine Collection

Fundy Tidal Power Development : Preliminary Evaluation of Its Environmental Consequences to the Resources of the State of Maine

A Report to the Maine State Planning Office by the Bigelow Laboratory for Ocean Sciences, April, 1984.

"Technical Report No. 35 - Bigelow Laboratory for Ocean Sciences, West Boothbay Harbor, Maine - A Division of Northeastern Research Foundation, Inc."

Contents: Executive Summary / Introduction / Methods / Physical and Biological Consequences / Socio-Economic Consequences / Research Needs / Bibliography / Appendix I. Written Comments on Greenberg Model