The Obstacles To The Modernization Of Common Support Equipment, J. Erik Ritschard Mar 2021

The Obstacles To The Modernization Of Common Support Equipment, J. Erik Ritschard

Theses and Dissertations

The current fleet of Common Support Equipment (CSE) is faced with a $2B funding disconnect that threatens 9 of the 12 USAF Core Functions. This research identifies the barriers to efforts to modernize CSE across the sustainment, acquisition, and maintenance communities. Using a qualitative, grounded theory methodology, the responses are explored of interviewed Support Equipment managers responsible for the sustainment and modernization of CSE. Significant barriers to current modernization efforts were exposed, resulting in expensive, duplicative, and unreliable equipment; concluding that the AF must change the way CSE is administrated, funded, and culturally understood to prevent future mission degradation.


The Effects Of Aircraft Use And Available Repar Spares On Aircraft Sortie Generaiton: A Long-Duration Logistical Wargaming Simulationtool, Nathaniel M. Choo Dec 2020

The Effects Of Aircraft Use And Available Repar Spares On Aircraft Sortie Generaiton: A Long-Duration Logistical Wargaming Simulationtool, Nathaniel M. Choo

Theses and Dissertations

A long-duration logistical wargame simulation tool that can provide quick insights into the daily aircraft availability and the daily number of missions accomplished for a variety of operational scenarios is developed. This simulation tool is designed to be a stepwise wargaming support tool for adjudication within long-duration logistical wargames and provides the user many capabilities including, but not limited to, the ability to have multiple bases and types of aircraft. Additionally, the user has the ability to control types of part failures, control parts availability, control maintenance capabilities, and control number of mission scheduled. Finally, the user can account for …


Secure Aircraft Maintenance Records Using Blockchain (Samr), Ahrash Aleshi May 2018

Secure Aircraft Maintenance Records Using Blockchain (Samr), Ahrash Aleshi

Doctoral Dissertations and Master's Theses

We propose to enhance the security and transparency of aircraft maintenance records in the aviation industry through the use of blockchain technology. A physical aircraft maintenance logbook is susceptible to being lost or destroyed. A nonexistent aircraft maintenance logbook hurts the confidence in integrity and reputation of the aircraft. Furthermore, fraud can occur through forgery of FAA personnel signatures and the installation of non-official aircraft parts. The scope of this work is to develop a secure blockchain that can store aircraft service records and information in a digital distributed ledger. By keeping the maintenance logbook on a digital ledger, records …


Development Of Availability And Sustainability Spares Optimization Models For Aircraft Reparables, Edmund K.W. Pek Sep 2013

Development Of Availability And Sustainability Spares Optimization Models For Aircraft Reparables, Edmund K.W. Pek

Theses and Dissertations

The Republic of Singapore Air Force (RSAF) conducts Logistics Support Analysis (LSA) studies in various engineering and logistics efforts on the myriad of weapon systems. In these studies, inventory spares provisioning, availability and sustainability analyses are key focus areas to ensure asset sustenance. In particular, OPUS10, a commercial-off-the-shelf software, is extensively used to conduct reparable spares optimization in acquisition programs. However, it is limited in its ability to conduct availability and sustainability analyses of time-varying operational demands, crucial in Operations & Support (O&S) and contingency planning. As the RSAF seeks force structure expansion to include more sophisticated weapon systems, the …


Composite Aircraft Life Cycle Cost Estimating Model, Daniel B. Lambert Mar 2011

Composite Aircraft Life Cycle Cost Estimating Model, Daniel B. Lambert

Theses and Dissertations

Composite materials are beginning to comprise a greater percentage of structural materials used throughout aircraft production. The increased usage of composites has led individuals within the Air Force community to revisit aircraft life cycle cost, LCC, models. A series of affordability initiatives has culminated in significant evidence over the last decade to better quantify the impact of primarily composite structures in aircraft. The Advanced Composite Cargo Aircraft, ACCA, a research effort sponsored by the Air Force Research Lab, attempted to determine the impact of part size and large scale composite components on LCC for cargo aircraft. This research evaluates the …


The Taiwan Civil Aviation Safety Reporting (Tacare) System In Aircraft Maintenance: An Evaluation Of The Acceptance Of Voluntary Incident Reporting Programs For Maintenance Personnel In Taiwan, Yi-Fan (Tom) Chen Jul 2010

The Taiwan Civil Aviation Safety Reporting (Tacare) System In Aircraft Maintenance: An Evaluation Of The Acceptance Of Voluntary Incident Reporting Programs For Maintenance Personnel In Taiwan, Yi-Fan (Tom) Chen

Master's Theses - Daytona Beach

The purpose of this research was to examine the effectiveness of the Taiwan Civil Aviation safety reporting (TACARE) system for maintenance personnel to improve aircraft safety. The research evaluated what are the issues that affect the participation of the TACARE system. The understandings of the safety culture for maintenance personnel in Taiwan were also analyzed. The research was conducted with a mixed method. The survey and interview were developed to sample the acceptance and opinions regarding the TACARE system for the maintenance personnel in Taiwan. Statistical analysis of the data from 605 survey respondents and 9 interviewees concluded the maintenance …


Comparison Of The Effects Of Eight-Hour And Twelve-Hour Shifts On Air Force Aircraft Maintenance Production Levels, David P. Collette Sep 1999

Comparison Of The Effects Of Eight-Hour And Twelve-Hour Shifts On Air Force Aircraft Maintenance Production Levels, David P. Collette

Theses and Dissertations

his is a follow-on study that examined the effects of converting a large aircraft maintenance squadron from 8-hour shifts to 12-hour shifts. The squadron studied converted its 24-hour maintenance work force from three 8-hour work shifts to two 12-hour work shifts. Data was collected from four different time periods. Three time periods were used for a primary analysis and all four time periods were used for trend analysis. To determine if the 12-hour work shift was effective, workforce productivity was measured during the different work shift periods. Results showed an increase in two productivity measurements, no-change in two productivity measurements, …


Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell Sep 1998

Effects Of Shiftwork On Air Force Aircraft Maintenance Personnel, Craig A. Campbell

Theses and Dissertations

This study examined the effects of converting a large aircraft maintenance squadron from 8-hour shifts to 12-hour shifts. The squadron studied converted its 24- hour maintenance work force from three 8-hour work shifts to two 12-hour work shifts incrementally, with one section converting to 12-hour shifts in January, 1996, and the remaining section converting in July, 1996. Both sections remained on 12-hour shifts until September, 1997, when both sections converted back to a three shift 8-hour operation. Health and well being, on- and off-duty accident rates, day shift vs. night shift accident rates, and the effects of stress and fatigue …


The Effects Of Three Media Presentation Systems On Maintenance Task Performance, John W. Chastain Sep 1998

The Effects Of Three Media Presentation Systems On Maintenance Task Performance, John W. Chastain

Theses and Dissertations

Wearable computers and Portable Maintenance Aids (PMAs) may soon be the normal way of doing aircraft maintenance in the Air Force. Currently, the Air Force uses the paper form of Technical Orders (TO's) while doing aircraft maintenance. The purpose of this thesis was to compare the effects of three different media presentations of the information used during aircraft maintenance. The three different presentations compared are the current paper form, a Head Mounted Display (HMD), and an auditory mode. An experiment was conducted to determine if there was a significant difference between the systems (in terms of task completion times and …


A Comparison Of 8-Hour Vs. 12-Hour Shifts On Performance, Health And Safety In A Usaf Aircraft Maintenance Squadron, Kelly J. Scott Sep 1998

A Comparison Of 8-Hour Vs. 12-Hour Shifts On Performance, Health And Safety In A Usaf Aircraft Maintenance Squadron, Kelly J. Scott

Theses and Dissertations

This study examined the effects of converting a large USAF aircraft maintenance squadron from an 8- hour shift system to a 12-hour shift system. In 1996, the squadron converted its 24-hour operations from three 8-hour work shifts, to two 12-hour work shifts with compressed work weeks. The squadron maintained 12-hour shifts for 19 consecutive months. A comparison was made of organizational performance, worker health and safety measures before, during and after 12-hour shift implementation. Findings indicated that changing from 8- to 12-hour shifts resulted in a slight increase in aircraft Mission Capability rates. However, this benefit appears to have come …


Value Of Increased Use Of Scheduled Maintenance On Aircraft Availability And Maintenance Cost Of The C-5, William T. Webb Sep 1998

Value Of Increased Use Of Scheduled Maintenance On Aircraft Availability And Maintenance Cost Of The C-5, William T. Webb

Theses and Dissertations

The C-5 consistently performs below its established mission capable rate of 75 percent. The purpose of this study was to investigate whether or not mission capable rates and maintenance costs can be improved by increased use of scheduled maintenance. Nine C-5 components were studied. Availability and cost were compared when scheduled replacement occurred at ten, twenty, and thirty percent before their respective mean time between failure and actual failure times. Actual failure times were not available so they were generated using simulation. The trade-off of using preventive maintenance is the decreased cost of sending fewer maintenance repair teams and increased …


The T-27 "Tucano" Engine Pipeline Of The Brazilian Air Force: A Managerial Approach, Jorge Barros Santos Jun 1998

The T-27 "Tucano" Engine Pipeline Of The Brazilian Air Force: A Managerial Approach, Jorge Barros Santos

Theses and Dissertations

The T-27 is a Brazilian-made aircraft, manufactured by "Empresa Brasileira de Aeronautica - EMBRAER". The purpose of this study is to describe the processes that take place in the logistic pipeline of the T-27 Engine. With the objective of identifying any existent bottlenecks and suggests managerial approaches to improve the overall system performance.


A Summative Evaluation Of Flightsafety International's Computer Assisted Instruction Known As "Principles Of Troubleshooting", Willie Don Middlebrooks May 1995

A Summative Evaluation Of Flightsafety International's Computer Assisted Instruction Known As "Principles Of Troubleshooting", Willie Don Middlebrooks

Master's Theses - Daytona Beach

The objective of this experimental research was to ascertain if cognitive skills developed by the "Principles of Troubleshooting" (POT) educational course improved aircraft fault diagnostic ability in aircraft maintenance trainees. Sixty randomly chosen Embry-Riddle Aeronautical University (ERAU) students served as control and experimental subjects with the POT course as the independent variable. Because random assignment was possible, a posttest-only control group design was used. Thirty ERAU maintenance trainees who had received basic and advanced ERAU fault diagnostic training were administered the POT course. A practical test administered to both groups using two tailed t tests for independent means indicated improvement …


An Outline For A Manufacturing Planning And Control System For A Repair/ Overhaul/Rebuilding Environment, Peter H. Miyares Mar 1992

An Outline For A Manufacturing Planning And Control System For A Repair/ Overhaul/Rebuilding Environment, Peter H. Miyares

Theses and Dissertations

This study outlines a structure for a manufacturing planning and control (MPC) system for a repair/overhaul/rebuilding environment. Included an examination of the organizational components that must be incorporated into the system and the planning functions for which the system can be used. The study compares and contrasts the differences between an MPC system for a maintenance organization and a manufacturing organization and concludes that the MPC system for a maintenance organization must account for the greater degree of variability that occurs within the process. The proposed system is composed of an information system which collects data from throughout an organization …