Articles 1 - 4 of 4

Full-Text Articles in Business Administration, Management, and Operations

Agile Software Development: Creating A Cost Of Delay Framework For Air Force Software Factories, J. Goljan, Jonathan D. Ritschel, Scott Drylie, Edward D. White Jan 2021

Agile Software Development: Creating A Cost Of Delay Framework For Air Force Software Factories, J. Goljan, Jonathan D. Ritschel, Scott Drylie, Edward D. White

Faculty Publications

The Air Force software development environment is experiencing a paradigm shift. The 2019 Defense Innovation Board concluded that speed and cycle time must become the most important software metrics if the US military is to maintain its advantage over adversaries.1 This article proposes utilizing a cost-o­f-d­elay (CoD) framework to prioritize projects toward optimizing readiness. Cost-­of-d­elay is defined as the economic impact resulting from a delaying product delivery or, said another way, opportunity cost. In principle, CoD assesses the negative impacts resulting from changes to the priority of a project.


Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak Jan 2018

Unmasking Cost Growth Behavior: A Longitudinal Study, Cory N. D'Amico, Edward D. White, Jonathan D. Ritschel, Scott R. Kozlak

Faculty Publications

This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle for 36 Department of Defense aircraft programs. Starting from Milestone B, the authors examine CGFs at five gateways: Critical Design Review, First Flight (FF), the end of Developmental Test and Evaluation (DT&E), Initial Operational Capability, and Full Operational Capability. Each CGF is assigned a color rating based upon the program’s cost growth: Green (low), Amber (moderate), or Red (high). Significant findings include dependencies among similar CGF color ratings and cost growth occurring primarily between FF and the end of DT&E during a program’s life cycle.


The Impact Of Learning Curve Model Selection And Criteria For Cost Estimation Accuracy In The Dod, Candace Honious, Brandon Johnson, John J. Elshaw, A. B. Badiru Apr 2016

The Impact Of Learning Curve Model Selection And Criteria For Cost Estimation Accuracy In The Dod, Candace Honious, Brandon Johnson, John J. Elshaw, A. B. Badiru

Faculty Publications

The first part of this manuscript examines the impact of configuration changes to the learning curve when implemented during production. This research is a study on the impact to the learning curve slope when production is continuous but a configuration change occurs. Analysis discovered the learning curve slope after a configuration change is different from the stable learning curve slope pre-configuration change. The newly configured units were statistically different from previous units. This supports that the new configuration should be estimated with a new learning curve equation. The research also discovered the post-configuration slope is always steeper than the stable …


Capturing Creative Program Management Best Practices, Brandon Keller, Joseph R. Wirthlin Apr 2013

Capturing Creative Program Management Best Practices, Brandon Keller, Joseph R. Wirthlin

Faculty Publications

This research attempted to capture the creative aspects of government program management in three specific areas: efficiently navigating oversight, capturing the intent of regulations, and developing innovative risk management practices. Respected acquisition leaders with diverse backgrounds and experiences were interviewed with ranks ranging from 0-6 to 0-8 and GS-15 to SES. Several contractor interviews were conducted for specific purposes. The data were iteratively coded and analyzed using ATLAS.ti. The results were categorized into four themes, each with three sub-elements. Differences between respondents with program director experience and those with rapid acquisition experience are discussed. A survey was then distributed to …