Open Access. Powered by Scholars. Published by Universities.®

Business Commons

Open Access. Powered by Scholars. Published by Universities.®

Engineering

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 4531 - 4560 of 4562

Full-Text Articles in Business

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Non-Standard Workweek Scheduling Technique Selection, John Alexander Oak May 1976

Non-Standard Workweek Scheduling Technique Selection, John Alexander Oak

Theses

This thesis presents a description of non-standard work scheduling techniques and a comparison method which enables decision-makers to differentiate between available work-scheduling alternatives with the purpose in mind of selecting the most appropriate and suitable arrangement. The method developed calls for the decision-maker to follow a five-step sequential process to obtain final results. The ingredients necessary to achieve such final results are obtained in a manner similar to that demanded by decision-making-under-uncertainty conditions commonly followed in actual industrial settings.

Since the primary objective of business management is the achievement of a profit through the manipulation of available resources, initial sections …


A Systems Study Of Oil Pollution Abatement And Control For Portland Inner And Outer Harbor, Casco Bay, Maine, Arthur D. Little, Inc. Mar 1976

A Systems Study Of Oil Pollution Abatement And Control For Portland Inner And Outer Harbor, Casco Bay, Maine, Arthur D. Little, Inc.

Maine Collection

A Systems Study of Oil Pollution Abatement and Control for Portland Inner and Outer Harbor, Casco Bay, Maine

to State of Maine, Department of Environmental Protection, State House Augusta, Maine 04330

Appropriation Number 4320-4001

by Arthur D. Little, Incorporated, 20 Acorn Park, Cambridge, Massachusetts 02140 (March 15, 1976).

Contents: Executive Summary / 1. Introduction / 2. Identification of Vulnerable Resources / 3. Potential Oil Spill Locations / 4. Oil Spill Movement / 5. Containment and Disposal Systems / 6. Oil Monitoring Systems / 7. Marine Navigation In Portland Inner and Outer Harbors / Appendices



Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior Jan 1976

Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient power revenues can be obtained from the sale of power under marketing arrangements consistent with Section 5 of the Flood Control Act of 1944 to repay all costs associated with the production and distribution of the power produced.


An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission Jan 1976

An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission

Dickey-Lincoln School Lakes Project

This report is a product of the New England Regional Commission's Energy Research and Policy Formulation Program. The goal of the Energy Program is to supply the members of the New England Regional Commission, which is comprised of the six New England Governors and a Federal Co-chairman appointed by the President, with reliable baseline information on New England's energy requirements and vulnerability, and to provide the Governors and the region with viable energy policy options and recommendations to guide New England's energy future.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Design For A Developing Consortium, Henry A. Mauermeyer May 1974

Design For A Developing Consortium, Henry A. Mauermeyer

Theses

The number of consortia in American higher education expanded rapidly from only ten in 1960 to eighty in 1973. Many do not have an organized method of developing interinstitutional cooperation, structuring their internal management, or preparing to meet future expansion.

The design of an organizational process appropriate to consortia in general has been developed in this thesis. The design is based on an analysis of various materials: (1) literature on the consortium movement; (2) data gathered from a nationwide survey conducted by the author; (3) visits with directors of consortia and experts in the consortium field; (4) actual working experience …


The Design And Implementation Of A Time-Shared Computer Based Construction Cost Estimating System For An Electric Utility, Thomas Arnold Westphal May 1974

The Design And Implementation Of A Time-Shared Computer Based Construction Cost Estimating System For An Electric Utility, Thomas Arnold Westphal

Theses

The work of the distribution department of an elec tric utility involves a great deal of medium to heavy construction. This work is vital to serve the energy needs of the public. An electric utility constantly builds, reinforces, and repairs electric distribution facilities. The material and labor used to accomplish this construction is expensive. Money in sufficient amounts is seldom, if ever, available to finance all proposed construction projects. Therefore, the cost of proposed projects must be estimated in advance, so that management may decide on an economic basis which projects will be authorized.

The need for accurate construction cost …


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.


Effectiveness Of Training Programs For Graduate Engineers, V.C. Rajashekar May 1972

Effectiveness Of Training Programs For Graduate Engineers, V.C. Rajashekar

Theses

This thesis represents an investigation of effectiveness as a result of engineering training. The basic elements of effectiveness and its learning process are explained and said that the effectiveness could be learnt and improved.

The term training, is basically the process of education and training. But training cannot be performed as an individual, but is performed as a group. Therefore training a group with having so many individuals needs careful consideration in designing a training program.

In order to get the broadest possible picture of current thinking and current activity in the area of company training programs for graduate engineers, …


Computer-Assisted Layout Design Planning For An Entree Production Center, Saundra H. Pierpoint Aug 1971

Computer-Assisted Layout Design Planning For An Entree Production Center, Saundra H. Pierpoint

Loma Linda University Electronic Theses, Dissertations & Projects

A productive layout design effectively utilizes men, materials, machines, and space. Determination of effective utilization of space and equipment arrangement for a food service system is based on the menu item production sequences. Utilization of computer processing of the data can provide quantitative information in minimal time for major planning decisions.

It was the purpose of this research 1) to determine an optimal equipment arrangement among four types of layouts for an entree-production center and 2) to demonstrate the value of the computer-assisted method in optimizing equipment arrangements.

The production sequences indicating equipment utilization and frequency factor for each of …


A Comparative Analysis Of Buyer Patterns In The Asphalt Paver Market, Leonard Llewellyn Decker Jan 1971

A Comparative Analysis Of Buyer Patterns In The Asphalt Paver Market, Leonard Llewellyn Decker

Masters Theses

No abstract provided by author.


How Many Acres Per Hour?, J G. Drever Jan 1970

How Many Acres Per Hour?, J G. Drever

Journal of the Department of Agriculture, Western Australia, Series 4

MANY farm tractor operators don't know exactly how much land is covered in an hour by implements drawn by their tractors. This information, useful on any farm where tractors are used, is of particular value in contract work.

The capacity of the machine or implement, or in other words, its rate of working, depends on the width of the machine, how fast it travels, how efficiently it is operated and the time it works.


Financing The Nuclear Fuel Requirements Of Public Utilities, Peter A. Lewis May 1969

Financing The Nuclear Fuel Requirements Of Public Utilities, Peter A. Lewis

Theses

A major portion of new electric generating capacity will be nuclear powered. The change to nuclear power will require large outlays of capital not required with conventional fuels to finance nuclear fuel inventories. Nuclear fuel financing requirements are unique because nuclear fuel is not consumed in the same manner as conventional fuels. Financing has not been a problem to date because nuclear fuel can be obtained only through lease from the Atomic Energy Commission. This arrangement will be terminated by June 30, 1973 and from that date on all nuclear fuel must be privately owned. Electric utilities have shown an …


Reliability Considerations For Communication Satellites, Frank Polizzi May 1968

Reliability Considerations For Communication Satellites, Frank Polizzi

Theses

A detailed program covering all phases of reliability for a communication satellite was presented. In long mission programs such as this one, reliability is the prime consideration in assuring a successful accomplishment of the stringent goals set forth. Reliability principles and methods were incorporated in delineating each major task in the program. These principles and methods not only aided the reliability personnel in performing their duties better, but also assisted the design group, manufacturing personnel, and the testing and evaluation group in performing their jobs efficiently by being aware and knowledgeable of reliability engineering.

Various reliability disciplines were imposed, as …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Planning And Scheduling Software Programs With Pert, Henry E. Mielo May 1965

Planning And Scheduling Software Programs With Pert, Henry E. Mielo

Theses

The use of the Program Evaluation and Review Technique (PERT) in planning and scheduling software programs was discussed in this thesis. A real world program, referred to as the Wrap-Around Simulation or WAS Project, was selected to illustrate that complex efforts in the software domain can respond favorably to modern planning and scheduling techniques

The WAS Project included the provision of a digital simulation of the shipboard environment in which a Digital Fire Control Computer (DFCC) would operate as part of a Digital Fire Control System. The digital simulation afforded a well controlled and conclusive checkout of the operational program …


Jurisdictional Disputes Within The Construction Industry, Dominick Joseph Magarelli May 1962

Jurisdictional Disputes Within The Construction Industry, Dominick Joseph Magarelli

Theses

Work assignment disputes, known as jurisdictional disputes are common in the construction industry. They are not only costly but annoying as well, The construction industry has always been plagued with this type of dispute because each of its many craft unions regards certain types of work as a proprietary right. They jealously guard against any encroachment of their area of activity by other unions. Sometimes lines of demarcation between the various jurisdictions are not clear. Also, the development of new products and methods often brings with it clashes between unions each of whom claim exclusive right to the work assignment. …


Hold On To Your Egg Profits, J A. Hoy Jan 1960

Hold On To Your Egg Profits, J A. Hoy

Journal of the Department of Agriculture, Western Australia, Series 4

IN recent years, much sound advice has been made available to poultry farmers to assist them in developing their properties and operating them on profitable lines.

Much of this advice has been utilised to good advantage, but there are still many properties on which the profits are being reduced by feed wastage, damage by rats and mice, lack of sufficient attention to egg quality, unnecessarily high labour costs and failure to keep farm records.


Department Of Agriculture Moved To South Perth, Department Of Agriculture, Western Australia Jan 1960

Department Of Agriculture Moved To South Perth, Department Of Agriculture, Western Australia

Journal of the Department of Agriculture, Western Australia, Series 4

After more than half a century in the historic but time-worn building, one of few adorned with the British Government crest of the Lion and the Unicorn, on the Eastern side of government gardens in St George's Terrace, the Departmnet of Agriculture has been transfred to a new location in South Perth.


A Study Of A Production Control System In A Job Order Die Casting Plant, Robert Gordon Woodnorth May 1958

A Study Of A Production Control System In A Job Order Die Casting Plant, Robert Gordon Woodnorth

Theses

This thesis examines the production planning and control system in a job-order die casting plant. After comparing to the criteria for an ideal system the following changes were recommended.

1. Central work storage and dispatching. This would reduce work in process and workload fluctuations through closer planning. It would also provide a perpetual inventory system and a central control point which would be constantly informed of production progress.

2. Operator trucking. By having operators do their own trucking material handling costs and production delays would be reduced.

3. Simplified job cost accounting. The use of standard costs for finishing and …


An Analysis Of Predetermined Time Systems, Richard Otto Schmid May 1957

An Analysis Of Predetermined Time Systems, Richard Otto Schmid

Theses

This paper endeavors to compare three predetermined time systems, namely; Work-Factor, Methods-Time Measurement and Basic Motion Time-study, elemental-by-elemental, through the use of a series of detailed analyses. The following information in the form of conclusions and recommendations has been set forth from the investigation of the various comparative analyses contained herein:

  1. Reasons for the variation between the elementals.

  2. A chronological order of attack for further study with an eye to accomplishing the most in the shortest possible time.

  3. The results of a composite analysis which utilizes the most realistic elemental definitions of the three systems. (This includes the comparison of …


The Control Of Industrial Sales Operations, Herbert Gieser May 1957

The Control Of Industrial Sales Operations, Herbert Gieser

Theses

With selling becoming so competitive in the past quarter century, managerial control over the sales organization is necessary for survivals Essentially, controls cover the regulation and administration of territories, expenses, and the measurement of performance.

The purpose of this thesis is to investigate the various phases of controls, the many plans which can be applied, and the advantages and disadvantages of these plans. Emphasis is placed on the case studies of some of the many firms which have put these control programs to work successfully.

This thesis is intended for management executives, sales managers, and sales staff executives in equipping …


The Development Of Executives, Joseph Ralph Messineo May 1953

The Development Of Executives, Joseph Ralph Messineo

Theses

The ever-increasing trend toward improved industrial efficiency creates the problem of supplying capable executives. The supply of executive manpower in business corporations ever needs replenishing. Expansion of operations, retirements, and other circumstances cause executive demands and vacancies which must be filled. Therefore, the purpose of this thesis is to analyze and report on what industry is actually doing today to develop executives to meet present and future requirements. Also, it is the author's intent to formulate a comprehensive executive development program that can be adopted with some limitations by industry for the building of an executive reserve.

In order to …


Manual For Quality Control, Frank Andrew Antalec May 1952

Manual For Quality Control, Frank Andrew Antalec

Theses

Modern trends of industrial development have been directed toward increased output of products with greater precision and uniformity. This necessitates an inspection function that reflects more effective results than ever before. In order to rise to this occasion full use must be made of today's principles and techniques of inspection and quality control.

Industry demand the use of high precision measuring instruments to aid the inspection function in obtaining effective results. Recently, however, the techniques of Quality Control have become a well-known, useful, tool for the solution of many manufacturing problems. Effective use of these techniques depends on their complete …


Cost Reduction Through Closer Control Of Quality, Walter Robert Kuzmin May 1952

Cost Reduction Through Closer Control Of Quality, Walter Robert Kuzmin

Theses

The economy of our nation differs today from that of World War II or pre-World War II days by the fact that a war-production program is being carried on without adversely affecting the production or civilian goods, At the same time management is confronted with rising costs due to the inflationary spiral of wanes and materials. To mire a profit on Products and remain in competition, management is forced to apply the latest cost reduction methods. Because of the dual economy, companies are quoting on civilian goods and war Products. Contracts released by the government specify that; adequate inspection and …