Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 11 of 11

Full-Text Articles in Construction Engineering

Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer Aug 2006

Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer

Planning

Construction of a new Third Bridge over the Kennebec River in Augusta offered the prospect of a new and handsome gateway to the city. Further, the resulting change in traffic patterns offered the City the chance to plan for a pattern of development quite different from what the city had experienced for the past half-century. The case study describes the planning and construction of the new bridge and corridors that re-routed traffic out of Augusta’s downtown and older neighborhoods, and created the opportunity for planned development adjacent to the corridor created by the new bridge. It goes on to describe …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix A, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route, and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, documenting an early phase of the overall studies, was first published by the Department of the Interior in February 1977. It is being republished as Appendix A to the DOE Environmental Impact Statement for the project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy

Dickey-Lincoln School Lakes Project

This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.


Ecological Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Ecological Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Ecological Resources Impact Study, Maps and Legend land cover types


Land Use Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Land Use Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Land Use Study, Maps, Existing land use


Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy Jan 1978

Visual-Recreation Resources Impact Study. Map Volume, United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Environmental Assessment of Alternative Routes, Visual/Recreational Resources Impact Studies, Maps of Recreational Resources


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.