Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Business Administration, Management, and Operations

California Polytechnic State University, San Luis Obispo

Articles 1 - 2 of 2

Full-Text Articles in Construction Engineering

Far West Water Ski Club Floating Dock Replacement, Jeffery L. Hadley Jun 2016

Far West Water Ski Club Floating Dock Replacement, Jeffery L. Hadley

Construction Management

A project based senior project, the Far West Floating Dock Project included the design, procurement and construction of two 20’x 20’ floating docks for the Lake Nacimiento based nonprofit Far West Water Ski Club. Constructed of polyethylene coated floats, 4x Pressure Treated lumber, hot-dipped galvanized hardware and composite decking, the dock is designed to have a lifespan of at least 35-40 years. This case study provides an overview of the complete project delivery, beginning with the conception and research, transitioning to design and procurement, and finishing with construction and lessons learned. The overall project cost landed at $21,712.00, made possible …


Cal Poly Brocade Challenge 2013, Chandler Morehardt, Alexa Coburn, Juan Silva, Kerry Sun, Greg Wang, Raul Chagoya, Jd Torres Jun 2013

Cal Poly Brocade Challenge 2013, Chandler Morehardt, Alexa Coburn, Juan Silva, Kerry Sun, Greg Wang, Raul Chagoya, Jd Torres

Architectural Engineering

No abstract provided.