Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Business Administration, Management, and Operations

Institution
Keyword
Publication Year
Publication
Publication Type
File Type

Articles 1 - 30 of 32

Full-Text Articles in Construction Engineering

Transdisciplinarity In Experience Design: A Global Survey Of Higher Ed Programs In Exd/Xd, Yvonne Houy Jan 2022

Transdisciplinarity In Experience Design: A Global Survey Of Higher Ed Programs In Exd/Xd, Yvonne Houy

Creative Collaborations

In our age of ubiquitous devices and digital media it is the perceived value of the end-to-end experience that brings people to a place. Designing inspiring and emotionally engaging end-to-end experiences requires experts in a wide range of disciplines committed to an interdisciplinary collaboration that can arrive at transdisciplinary design - the sum becomes greater than its parts.

Civil engineering, hospitality, business, psychology, digital User Experience (UX) design, and experience data analysis need to be seamless integrated with the fine and performing arts and design fields:

  • Architecture, interior, landscape and sound design actively engage the senses.

  • Graphic and fine arts …


Early Supplier Involvement Framework For Reducing Construction Waste During The Design Process, Ayman Ahmed Ezzat Othman, Yomna Abdelghany El-Saeidy Jan 2022

Early Supplier Involvement Framework For Reducing Construction Waste During The Design Process, Ayman Ahmed Ezzat Othman, Yomna Abdelghany El-Saeidy

Architectural Engineering

Purpose – The purpose of this paper is to develop a framework to facilitate early supplier involvement (ESI) as an approach for reducing construction waste (CW) generated during the design process. Design/methodology/approach – A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, the literature review was used to investigate CW, CW generated during the design process, the design process and ESI. Second, two construction projects were analysed to investigate the role of ESI towards reducing CW generated during the design waste. Third, a survey questionnaire was carried out with …


Ua3/1/1 President's Office-Cherry Reports, Wku Archives Jan 2021

Ua3/1/1 President's Office-Cherry Reports, Wku Archives

WKU Archives Collection Inventories

Reports made by Henry Cherry to the Board of Regents and departmental reports made to Henry Cherry.


Leadership Behaviour And Worker Performance In The Nigerian Construction Industry, Abiodun Kolawole Oyetunji, John Adebiyi, Nathaniel Ayinde Olatunde Jul 2019

Leadership Behaviour And Worker Performance In The Nigerian Construction Industry, Abiodun Kolawole Oyetunji, John Adebiyi, Nathaniel Ayinde Olatunde

The Journal of Values-Based Leadership

Leadership is a dynamic process in which an individual influence other to contribute to the achievement of an assigned task. This paper investigates leadership behaviour and its impact on construction workers’ performance in Lagos, Nigeria. Purposive sampling technique was adopted to select 50 site-supervisors and 250 construction-workers involved in simple construction works. An investigation was carried out using a questionnaire survey method. The leadership variables investigated were ranked, regressed and correlated to workers performance. From the primary data analysis, leadership behaviour exhibited by supervisors were found to influence the site workers commitment to achieving the goal of the construction projects. …


What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


Far West Water Ski Club Floating Dock Replacement, Jeffery L. Hadley Jun 2016

Far West Water Ski Club Floating Dock Replacement, Jeffery L. Hadley

Construction Management

A project based senior project, the Far West Floating Dock Project included the design, procurement and construction of two 20’x 20’ floating docks for the Lake Nacimiento based nonprofit Far West Water Ski Club. Constructed of polyethylene coated floats, 4x Pressure Treated lumber, hot-dipped galvanized hardware and composite decking, the dock is designed to have a lifespan of at least 35-40 years. This case study provides an overview of the complete project delivery, beginning with the conception and research, transitioning to design and procurement, and finishing with construction and lessons learned. The overall project cost landed at $21,712.00, made possible …


Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov Oct 2015

Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov

Ludmilla D Pavlova

The UMass Amherst Campus Master Plan Sustainability Chapter articulates the manner in which the Campus Master Plan 2012 principles translate into specific recommendations for campus systems development in support of future smart growth. It summarizes the current physical campus-scale planning projects that Facilities & Campus Services have completed during and after the Master Plan process, and incorporates other operational and educational initiatives that have engaged our campus community as we plan for sustainability. The CMP Chapter is organized in three major sections: i) sustainability overview; ii) campus master plan systems; iii) current initiatives; and iv) next steps. The first section …


Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov Jan 2015

Umass Amherst Campus Master Plan Sustainability Chapter, Ludmilla Pavlova-Gillham, Nariman Mostafavi, Mohamad Farzinmoghadam, Kylie A. Landrey, Somayeh Tabatabaee Pozveh, Ezra Small, Ted Mendoza, Jason J. Burbank, Robert Ryan, Dennis Swinford, Niels La Cour, Alexander Stepanov

Campus Planning Master Plans

The UMass Amherst Campus Master Plan Sustainability Chapter articulates the manner in which the Campus Master Plan 2012 principles translate into specific recommendations for campus systems development in support of future smart growth. It summarizes the current physical campus-scale planning projects that Facilities & Campus Services have completed during and after the Master Plan process, and incorporates other operational and educational initiatives that have engaged our campus community as we plan for sustainability.

The CMP Chapter is organized in three major sections: i) sustainability overview; ii) campus master plan systems; iii) current initiatives; and iv) next steps. The first section …


Campus Planners' Preferences For Residence Hall Project Delivery Methods, Paul E. Riel Jan 2015

Campus Planners' Preferences For Residence Hall Project Delivery Methods, Paul E. Riel

UNF Graduate Theses and Dissertations

This research determined the preferred project delivery method utilized by campus planners when building student housing on a university campus. Four key performance indicators were also evaluated to determine if they influenced the campus planner to select a particular project delivery method. The four key performance indicators were: owner input, cost, safety, and on-time completion. Campus planners identified though the Society for Campus and University Planners (SCUP), were invited to participate in this survey research method. Five research questions were explored in this study. They were:

1. What is the preferred project delivery method (PDM) when building a residence hall …


Facility Matters: The Perception Of Academic Deans Regarding The Role Of Facilities In Higher Education, Wallace Harris Jan 2014

Facility Matters: The Perception Of Academic Deans Regarding The Role Of Facilities In Higher Education, Wallace Harris

UNF Graduate Theses and Dissertations

The purpose of this study was to examine how academic deans perceived the characteristics of facility built environment and its impact on learning in higher education. Q methodology was used as the means to explore the subjective opinions of academic deans within the State of Florida regarding the facility built environment’s impact on learning in higher education. For this Q study, the concourse statements were the result of communications taken from the subject literature and participant responses to this study’s online concourse questionnaire. The resulting 32 item Q sample was sorted online by 43 academic deans, associate and assistant deans. …


Implementation Of Integrated Project Delivery On Department Of Navy Military Construction Projects, Christopher S. Lee Aug 2013

Implementation Of Integrated Project Delivery On Department Of Navy Military Construction Projects, Christopher S. Lee

UNLV Theses, Dissertations, Professional Papers, and Capstones

The concept of the project delivery system refers to the overall processes by which a project is designed, constructed, and/or maintained. There are many different types of project delivery systems to fit particular situations involving the owner and his intended project. The project delivery system is what establishes the framework that enables a construction project to be developed and ultimately executed.

The construction industry has observed that projects (both private and public) frequently suffer from factors such as adversarial relationships, low roductivity, high inefficiency and rework, frequent contractual disputes concerning who was at fault, and lack of innovation. Not only …


Cal Poly Brocade Challenge 2013, Chandler Morehardt, Alexa Coburn, Juan Silva, Kerry Sun, Greg Wang, Raul Chagoya, Jd Torres Jun 2013

Cal Poly Brocade Challenge 2013, Chandler Morehardt, Alexa Coburn, Juan Silva, Kerry Sun, Greg Wang, Raul Chagoya, Jd Torres

Architectural Engineering

No abstract provided.


Extending The Project Management Skillset To Encompass Change Implementation, Lynn Crawford Oct 2012

Extending The Project Management Skillset To Encompass Change Implementation, Lynn Crawford

Lynn Crawford

Project management standards address change control but are largely silent on change implementation. As the majority of projects involve some degree of organizational or behavioural change, and as project management is now applied to implementation of organisational changes as a specific project type, extension of coverage to recognise specific activities and competencies involved in effective change implementation should be considered in review of project management standards. As input to such a review, this paper presents results of research investigating the project and change implementation practices used, in practice, on projects requiring varying degrees of organizational and behavioural change.


Comparing Apples With Apples: Aligning Project Management Capability With Corporate Strategy, Lynn Crawford Oct 2012

Comparing Apples With Apples: Aligning Project Management Capability With Corporate Strategy, Lynn Crawford

Lynn Crawford

It makes little sense for an organization to invest in project management systems that are not directly suited to the nature of their business yet they need some form of guidance to tell them what good looks like. Generic project management maturity models can be a useful starting point but they take no account of differences in context and using them is like comparing apples with oranges. This paper presents results of research that investigates differences in strategic drivers and associated project management practices and outcomes between industries. Results of this research provide input to development of more compelling and …


A Vision For A Longer-Term Future: From Project Managers To “Synthesists”?, Alan Stretton, Lynn Crawford Oct 2012

A Vision For A Longer-Term Future: From Project Managers To “Synthesists”?, Alan Stretton, Lynn Crawford

Lynn Crawford

This paper first gives a snapshot of how some articulate contributors to a broader future-oriented non-management literature perceive the growth of specialization of avocations/ professions. A primary drawback is seen to be a resultant lack of people who are fluent in the language of many different disciplines, and who have the ability to expertly integrate them to achieve broader societal goals – i.e. “synthesists”.Project managers essentially integrate the contributions of many varied disciplines to achieve beneficial outcomes. Therefore project management appears to be extremely well placed to broaden its perspectives, and to develop and consolidate a role as “synthesists” in …


Fitting Project Management Capability To Strategy, Lynn Crawford Oct 2012

Fitting Project Management Capability To Strategy, Lynn Crawford

Lynn Crawford

Project management is now recognized as an organizational capability and there are numerous generic maturity models providing one size fits all approaches to what is considered to be best practice. Both maturity models and best practices are problematic. Maturity models typically suggest that all firms must strive to progressively achieve prescribed levels of practice across the same range of best practices. But what constitutes best practice for whom and under what circumstances? If we look at an organization’s project management systems, although they may have similarities across firms, they are operating in different contexts, driven by different strategies. What may …


Portfolio Management: Roles, Responsibilities And Practices - A Qualitative Study, Aileen Koh Jul 2012

Portfolio Management: Roles, Responsibilities And Practices - A Qualitative Study, Aileen Koh

Aileen Koh

The increasing use of project and programs by organizations to achieve business strategy has led to the need to understand portfolio management. Along with the increasing diffusion of portfolio management a new managerial role evolves: the portfolio manager. This new role is pivotal in planning and controlling complex project landscapes more effectively and more efficiently, in implementing portfolio management practices as a management innovation.The practices of portfolio management, together with the associated roles, responsibilities of portfolio managers were investigated. This paper presents the first stage qualitative study, using an inductive interview based approach with six portfolio managers from six organizations …


Sensemaking Of Rework Causation In Offshore Structures: People, Organization And Project, Peter E. D. Love, Jim Smith, Sangwon Han Jul 2012

Sensemaking Of Rework Causation In Offshore Structures: People, Organization And Project, Peter E. D. Love, Jim Smith, Sangwon Han

Jim Smith

Cost and schedule overruns are norm in offshore hydrocarbon projects. With increasingly complex commercial and contracting arrangements, technical challenges, changing local economic and regulatory conditions and a shift toward project‘s being undertaken in peak oil frontier regions, the risks of overruns increase. A major factor contributing to such overruns is rework. Twenty three indepth interviews with leading oil and gas industry practitioners were undertaken to acquire knowledge of their experiences of rework causation in offshore projects. Analysis of the dialogue and narratives obtained enabled a nomenclature for rework causal factors to be classified as People, Organization and Project for different …


Construction Cost Models, Barry Dikeman Aug 2010

Construction Cost Models, Barry Dikeman

Economics and Finance

The following are a series of cost estimate models similar in format to a typical engineer’s estimate that were developed in support of our financial impact assessment report for LD 1725. The models us current material costs, labor costs, and equipment costs for the region to provide a comparative cost analysis of seven culvert replacement scenarios. The models provide information about what the cost impact of LD 1725 would be for typical culvert replacements in Maine. However, due to the inherent restrictions of the cost modeling framework we were not able to include the abundance of variables that would be …


Comprehensive Academic And Classroom Facilities Plan, Joel Nordberg, Alex Wing, Jeff Funovits, Emily Blaze, Jenna Beltram, Ann Storer, Bryan Harvey, Ludmilla D. Pavlova-Gillham Dec 2009

Comprehensive Academic And Classroom Facilities Plan, Joel Nordberg, Alex Wing, Jeff Funovits, Emily Blaze, Jenna Beltram, Ann Storer, Bryan Harvey, Ludmilla D. Pavlova-Gillham

Campus Planning Books

In 2009 UMass Amherst, under the direction of Chancellor Robert Holub, engaged in a Framework for Excellence initiative and a commitment to elevate the national profile of the institution. The Framework for Excellence called for the recruitment of 250 additional faculty and an increase of 2,500 undergraduate students over the next 10 years. More space and improved, state-of-the-arts facilities was recognized as key in attracting and retaining the highest caliber faculty and students.

The Comprehensive Academic and Classroom Facilities Plan was funded by the MA Division of Capital Asset Management & Maintenance (DCAMM), which hired Burt Hill to initiate an …


Incorporating Value And Risk Management Principles In Developing Low-Income Housing Projects, Ayman Ahmed Ezzat Othman Jan 2008

Incorporating Value And Risk Management Principles In Developing Low-Income Housing Projects, Ayman Ahmed Ezzat Othman

Architectural Engineering

The construction industry is concerned with satisfying its customers’ needs through delivering projects that achieve their objectives and meet their expectations on time, within budget and as specified. Despite the several housing programmes constructed by government authorities, there is a real housing problem for the poor. This problem is attributed to a number of reasons. Amongst them, the inability of the low-incomers to cover the cost of supplied houses and the lack of the constructed projects to achieve users’ satisfaction. This highlighted the need to develop innovative and creative solutions that can deliver housing projects that achieve the satisfaction of …


Ua96/2 Southern Normal School Board Of Directors, Wku Archives Jan 2008

Ua96/2 Southern Normal School Board Of Directors, Wku Archives

WKU Archives Collection Inventories

Records created by and about the Southern Normal School Board of Directors. Series includes certificates of incorporation, meeting minutes, financial records, construction records, contracts, correspondence and scrapbooks.


Inside Unlv, Diane Russell, Shane Bevell, David Ashley, Grace Russell, Lisa Shawcroft Mar 2007

Inside Unlv, Diane Russell, Shane Bevell, David Ashley, Grace Russell, Lisa Shawcroft

Inside UNLV

No abstract provided.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division Jan 1978

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix C: Social & Economic Assessment (Supplement 1), Pamela D. Savetsky, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

A review of available literature on rural communities which have been affected by construction projects of a similar scale has been completed. This review will aid in the development of a scenario of the construction labor peak and decline effects on the Dickey-Lincoln area.


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


President's Report, Wku President's Office - Cherry Jul 1936

President's Report, Wku President's Office - Cherry

Board of Regents Documents

President Henry Cherry's report to the Board of Regents:

  • Receipts & Expenditures pp. 2-12
  • Salary Schedules pp. 13-19
  • Valuation of the Plant pp. 20-23
  • Cherry Hall Construction pp. 25-26
  • Chimes p. 27
  • Heating Plant p. 28
  • Landscaping pp. 29-31
  • Mechanical Condition of Buildings pp. 32-37
  • College Heights Foundation (includes Kentucky Building) pp. 38-41
  • Enrollment & Costs of Kentucky State Institutions pp. 42-45
  • Canon, E.H. Registrar's Report pp. 46-63, 65-76
  • Ogden Medals & Awards 1928-1935 p. 64
  • Students Enrolled & Graduates 1934-1935 pp. 77-90
  • Grise, Finley. Report of the Dean of the College pp. 91-110


President's Report, Wku President's Office - Cherry Dec 1931

President's Report, Wku President's Office - Cherry

Board of Regents Documents

President Henry Cherry's report to the Board of Regents regarding finances and construction of the swimming pool and president's home.