Open Access. Powered by Scholars. Published by Universities.®

Architectural Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 7 of 7

Full-Text Articles in Architectural Engineering

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service Jan 2011

A Financial Impact Assessment Of Ld 1725: Stream Crossings, New England Environmental Finance Center, Muskie School Of Public Service

Water

This report looks at the potential financial impact of LD 1725 on the estimated 30,000 stream crossings in the State of Maine that would be affected by the law. Our research for this report included the analysis of nearly 2000 stream crossings and the data collection necessary for the development of extensive stream crossing replacement cost models. We found that the 1.2 bankfull requirements in LD 1725 would result in a 75% ‐ 250% increase in structure widths for stream crossing projects across the state. An upsize of this magnitude would increase the cost of replacing stream crossings statewide by …


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Water

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project.


Culvert Material Cost Comparison, New England Environmental Finance Center Nov 2010

Culvert Material Cost Comparison, New England Environmental Finance Center

Economics and Finance

The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project. Table 1 displays the cost per foot purchase price arranged by diameter size for the various culvert materials that are currently available. Table 2 displays the average additional culvert pipe material cost (increased cost to upsize minus original in-kind replacement cost) that would be incurred when upsizing a given diameter of culvert with a 50 foot length by factors of: 200%, 250% and 300%.


Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer Aug 2006

Augusta Me: The New Bridge Begets A New Planned Neighborhood, Molly Pulsifer, Richard Barringer

Planning

Construction of a new Third Bridge over the Kennebec River in Augusta offered the prospect of a new and handsome gateway to the city. Further, the resulting change in traffic patterns offered the City the chance to plan for a pattern of development quite different from what the city had experienced for the past half-century. The case study describes the planning and construction of the new bridge and corridors that re-routed traffic out of Augusta’s downtown and older neighborhoods, and created the opportunity for planned development adjacent to the corridor created by the new bridge. It goes on to describe …


The Maine Competition: Architectural Design For Low-Cost Housing, Maine State Planning Office Oct 1976

The Maine Competition: Architectural Design For Low-Cost Housing, Maine State Planning Office

Maine Collection

The Maine Competition: Architectural Design for Low-Cost Housing - Submissions - October 1976.


Sponsoring Agencies: Allen Pease, Director, State Planning Office; Genevieve Gelder, Director, State Housing Authority; Evan Richert, Sam Ely Community Services Corp.

"The Competition was funded in part by grants from the Maine State Commission on the Arts and Humanities and a HUD Comprehensive Planning and Assistance Grant."


Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation Jan 1973

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation

Maine Collection

Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland

Report by Fay, Spofford & Thorndike, Inc., Engineers, Boston, Mass.

Prepared for the Maine Department of Transportation, Augusta, Maine, 1973.

Contents: Table of Contents / List of Figures / List of Tables / Introduction / Summary of Findings / Section 1 - General Background - Location Study / Section 2 - Alternative Facilities and Locations / Section 3 - Comparison of Construction Costs - Tunnel Versus Bridge / Section 4 - Traffic Analysis / Section 5 - Cost Effectiveness Analysis / Section 6 - Financial …


Maine Granite Quarries And Prospects, John R. Rand May 1958

Maine Granite Quarries And Prospects, John R. Rand

Maine Collection

Maine Granite Quarries and Prospects : Minerals Resources Index No.2

John R. Rand, State Geologist - Maine Geological Survey

Department of Economic Development, Augusta, Maine : May 1, 1958.

Contents: Introduction / Acknowledgements / Explanatory Considerations / Selected Bibliography / Granite Quarries and Prospects -- Alphabetical Index / Granite Quarries and Prospects -- Country-Township Index / Buildings and Structures Built of Maine Granites / Granite Quarries and Prospects-Map Index (missing).