Articles 1 - 7 of 7

Full-Text Articles in Architecture

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division Jan 1980

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division

Dickey-Lincoln School Lakes Project

The purpose of this Draft Supplement (SDEIS) to the Revised Draft Environmental Impact Statement (RDEIS) is to evaluate the environmental impacts of the Fish and Wildlife Mitigation Plan proposed for Implementation in conjunction with development of the Dickey-Lincoln School Lakes Project, Maine (Appendix K, RDEIS and Attachment 1 of the Report). Although the mitigation plan is intended to mitigate rather than impose adverse environmental impacts, the mitigation measures proposed do constitute a major Federal action requiring the development of a supplemental environmental impact statement pursuant to the National Environmental Policy Act of 1969.


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents the results of several studies undertaken to provide an understanding of present and potential future water quality conditions within and downstream from Dickey and Lincoln School Lakes in accordance with the requirements of ETL 1110-2-1402, dated 12 November 1976. Included are an examination of baseline water quality conditions and the findings of qualitative and quantitative predictive analyses performed to evaluate water quality conditions during all phases of the project's lifetime. This document will also serve as a reference for the water quality portions of the project Environmental Impact Statement.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …