Open Access. Powered by Scholars. Published by Universities.®
- Keyword
- Publication Type
Articles 1 - 3 of 3
Full-Text Articles in Architecture
The Forts Of Maine, 1607-1945: An Archaeological And Historical Survey, Robert L. Bradley Ph.D
The Forts Of Maine, 1607-1945: An Archaeological And Historical Survey, Robert L. Bradley Ph.D
Maine Collection
The Forts of Maine, 1607-1945: An Archaeological and Historical Survey
by Robert L. Bradley, Ph.D. - Maine Historic Preservation Commission
This booklet was co-published in September, 1981 by the Maine Historic Preservation Commission and the Maine Bureau of Parks and Recreation, with Federal funds provided by the Commission through the National Park Service, Department of the Interior, matched by State funds provided by the Bureau of Parks and Recreation. Earle G. Shettleworth, Jr., State Historic Preservation Officer
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy
Dickey-Lincoln School Lakes Project
This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England
Dickey-Lincoln School Lakes Project
The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …