Open Access. Powered by Scholars. Published by Universities.®

Conference

Municipal engineering

Articles 1 - 1 of 1

Full-Text Articles in Infrastructure

Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista Apr 2013

Owners’ Satisfaction Level With The Use Of Alternative Project Delivery Methods In Water And Wastewater Infrastructures, Pramen Shrestha, Jacimaria R. Batista

College of Engineering: Graduate Celebration Programs

In 2013, the American Society of Civil Engineers (ASCE) Report Card for America’s Infra-structure stated that the US needs up to $1.3 trillion in capital investments to replace the aging water pipes and repair the wastewater infrastructures. It is further believed by the industry that the streamlined approach of alternative project delivery methods, such as Design-Build (DB), and Construction Manager At-Risk (CMAR) helps ensure the economical and timely design and construction of the water and wastewater infrastructures.